Show on map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Amdel: route and 50 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Amdel
Crude oil pipeline
Key facts
Crude oil pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-TX
- Operated by
- SunocoSourceEIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 523
- Units
- 2
All 5 attributes from EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 2 |
| Operator, as the source states it | SUNOCO |
| Mapped segments | 2 |
| Source release | 202001 |
| Pipeline name raw | Amdel |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Sources
- EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)Source: U.S. Energy Information Administration, U.S. Energy Atlas, Crude Oil Pipelines (as of January 2020)
- EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Coke BESS Studied | Storage | 0.3 km | 220.3 |
| Limewood Bell Renewables Solar Under construction | Solar + storage | 1.3 km | 254.6 |
| TEMPLE 5MW DATA CENTER Built | Large load | 2.0 km | |
| Amelia Energy Center Postponed | Gas, combined cycle | 2.1 km | 900 |
| Rosebud Solar, LLC Postponed | Solar | 2.3 km | 132 |
| Blue Jay Solar I, LLC Under construction | Solar | 2.4 km | 210 |
| Hanson Contracted | Solar | 2.5 km | 398.8 |
| Cannibal Draw Solar and Storage Contracted | Solar + storage | 2.9 km | 248.1 |
| FREEBIRD DATA CENTER Under construction | Large load | 3.6 km | |
| Big Elm Storage Postponed | Storage | 3.9 km | 100 |
| SB ENERGY - ORION DATA CENTER Under construction | Large load | 4.4 km | |
| Bob Creek Wind, LLC Announced | Wind | 4.7 km | 175 |
| Project Orion (Burlington data centre) Filed | Large load | 4.8 km | |
| Cattlemen Solar Park Under construction | Solar | 5.0 km | 240 |
| Yaupon Solar Project (Hybrid) Under construction | Solar + storage | 5.1 km | 300.8 |
| Chisme Solar and Storage Under construction | Solar + storage | 5.8 km | 297.7 |
| CC2500 - AUS01 Temple TX (Temple data centre) Filed | Large load | 5.9 km | |
| AUS01 (Temple data centre) Filed | Large load | 6.5 km | |
| AUS02 DATA CENTER Under construction | Large load | 6.8 km | |
| AUS04 DATA CENTER Under construction | Large load | 7.3 km | |
| Lone Star Power Station Studied | Gas, other | 8.0 km | 478 |
| Bhalu Studied | Storage | 8.3 km | 205.5 |
| Zephyr Storage Announced | Storage | 8.8 km | 185.6 |
| Cattlemen Solar II Under construction | Solar | 9.0 km | 200 |
| Wallie Storage Postponed | Storage | 9.5 km | 200 |
| Tennyson Solar Under construction | Solar | 9.7 km | 150 |
| Two Rivers Solar Postponed | Solar | 9.7 km | 214 |
| Hermes Storage BESS Under construction | Solar + storage | 9.8 km | 200.8 |
| Champaign BESS, LLC Contracted | Storage | 11.4 km | 201.1 |
| Chillingham Solar Built | Solar | 11.6 km | 352.4 |
| Legend Power Station Studied | Gas, other | 12.0 km | 820 |
| Lupinus Solar 1, LLC Under construction | Solar + storage | 12.4 km | 246.3 |
| Lupinus Solar 2, LLC Contracted | Solar + storage | 12.4 km | 366.9 |
| Trinity River Solar 1 × 2 units Filed | Solar | 13.0 km | 225 |
| Orange County Advanced Power Station Under construction | Gas, combined cycle | 13.3 km | 1,306 |
| Honey Mesquite Wind, LLC Under construction | Wind | 13.7 km | 180.5 |
| Piney Woods Solar Under construction | Solar | 14.1 km | 150 |
| Major Oak Power Postponed | Coal | 14.9 km | 600 |
| GBG SOLAR Under construction | Solar | 16.4 km | 22.2 |
| Tidwell Prairie II Built | Storage | 17.0 km | 203.6 |
| Barton Branch IA Under construction | Storage | 17.0 km | 200 |
| Bee Branch IA Under construction | Storage | 17.2 km | 200 |
| SOSA Energy Center Under construction | Storage | 20.0 km | 154.6 |
| Central Utility Plant - Texas A&M Announced | Gas, combined cycle | 21.7 km | 5 |
| Tex-Bar ESS Contracted | Storage | 21.9 km | 201.5 |
| Hayrick BESS Studied | Storage | 22.5 km | 113.9 |
| Sypert Branch Solar Built | Solar | 22.9 km | 261.1 |
| Votaw Solar Station Announced | Solar | 23.2 km | 141 |
| McCrae Wind Energy II Under construction | Wind | 23.3 km | 162.1 |
Sources ERCOT · EIA-860M · EPA ICIS-NPDES · FAA OE/AAA · Berkeley Lab
Sources
- ERCOT GIS Report (Generator Interconnection Status)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)
- LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.