Show on map
Anderson Regional Landfill — Power plant · Biomass · South Carolina Public Service AuthorityGedosch Solar II — Postponed · Solar · SC · 2 MW · 5.4 mi awayIndigo Solar — Postponed · Solar · SC · 2 MW · 8.4 mi awayWebster Solar — Postponed · Solar · SC · 5.4 MW · 11.7 mi awayYork Solar — Postponed · Solar · SC · 2 MW · 12.9 mi awayIWS ANDERSON DATA CENTER PROJECT PHASE 2 — Under construction · Large load · SC · 13.9 mi away
  • Bioenergy
  • Loads
  • Under construction
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Anderson Regional Landfill

Power plant · Biomass

Key facts

Power plant · Biomass Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2008
Net generation, 2023
0 MWh
Grid
12 kV to Duke Energy Carolinas, LLC (DUK)
Location
Anderson County, South Carolina

Output

Net generation MWh by year, 2006 to 2023
Fuel burned MMBtu by year, 2006 to 2023
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
18 years since 2008
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeDUK

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
January 2023
Capacity retired
3.2 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
A2Landfill Gas1.6 MWRetiredJanuary 2023
A3Landfill Gas1.6 MWRetiredJanuary 2023

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV
Transmission or distribution system owner
Duke Energy Carolinas, LLC
Balancing authority
Duke Energy Carolinas
NERC region
SERC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
South Carolina Public Service Authority Operator EIA-860M
WASTE CONNECTIONS US INC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units A2, A3 scheduled to retire, 3.2 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Gedosch Solar II Postponed Solar 5.4 mi 2
Indigo Solar Postponed Solar 8.4 mi 2
Webster Solar Postponed Solar 11.7 mi 5.4
York Solar Postponed Solar 12.9 mi 2
IWS ANDERSON DATA CENTER PROJECT PHASE 2 Under construction Large load 13.9 mi

Sources EIA-860M · EPA ICIS-NPDES