Show on map
Animas — Power plant · Gas, steam turbine · City of Farmington - (NM)Westside - (NM) — Gas, reciprocating engine · NM · 60 MW · 11.4 km awayRockmont Solar and Storage Project — Solar + storage · NM · 130 MW · 17.3 km awayFoxtail Flats Solar, LLC — Solar + storage · NM · 250 MW · 17.6 km awayFour Mile Mesa Solar, LLC — Solar + storage · NM · 200 MW · 17.6 km awayNTEC Gas Plant — Gas, combustion turbine · NM · 1,089 MW · 23.5 km awayPinon Energy Center — Gas, combustion turbine · NM · 292.6 MW · 23.8 km away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 0% of 2019 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1927
Net generation, 2019
1,421 MWh
Grid
69 kV to City of Farmington - (NM) (WACM)
Location
San Juan County, New Mexico

Output

Net generation MWh by year, 2001 to 2020
Fuel burned MMBtu by year, 2001 to 2020
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
99 years since 1927
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110001547675
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1005490
Balancing authority codeWACM

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
October 2020
First unit retired
December 2006
Capacity retired
50.3 MW
Generators retired
6
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
HY1Conventional Hydroelectric0.2 MWRetiredDecember 2006
3Natural Gas Steam Turbine9 MWRetiredNovember 2012
ST4Natural Gas Steam Turbine16.5 MWRetiredNovember 2012
1Natural Gas Fired Combined Cycle3 MWRetiredMarch 2015
2Natural Gas Fired Combined Cycle3 MWRetiredMarch 2015
GT1Natural Gas Fired Combustion Turbine18.6 MWRetiredOctober 2020
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Steam Turbine25.5 MW
Natural Gas Fired Combustion Turbine18.6 MW
Natural Gas Fired Combined Cycle6 MW
Conventional Hydroelectric0.2 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
City of Farmington - (NM)
Balancing authority
Western Area Power Administration - Rocky Mountain Region
NERC region
WECC
Transmission lines within 25 km (5)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
City of Farmington - (NM) Operator EIA-860M
CITY OF FARMINGTON NEW MEXICO Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Unit GT1 scheduled to retire, 18.6 MW · EIA-860M
  • Stated Units 1, 2 scheduled to retire, 6 MW · EIA-860M
  • Stated Units 3, ST4 scheduled to retire, 25.5 MW · EIA-860M
  • Stated Unit HY1 scheduled to retire, 0.2 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Westside - (NM) Under construction Gas, reciprocating engine 11.4 km 60
Rockmont Solar and Storage Project Filed Solar + storage 17.3 km 130
Foxtail Flats Solar, LLC Under construction Solar + storage 17.6 km 250
Four Mile Mesa Solar, LLC Under construction Solar + storage 17.6 km 200
NTEC Gas Plant Filed Gas, combustion turbine 23.5 km 1,089
Pinon Energy Center Postponed Gas, combustion turbine 23.8 km 292.6

Sources EIA-860M

Sources

Attribution