Show on map
AP Sunray LLC — Power plant · Solar · AP Sunray LLCUvalde 2 BESS 1 — Postponed · Storage · TX · 75 MW · 6.9 mi awayUvalde 2 BESS 2 — Postponed · Storage · TX · 150 MW · 6.9 mi awayUvalde Solar 2 — Announced · Solar · TX · 300 MW · 6.9 mi awayUvalde Solar 1 — Postponed · Solar · TX · 150 MW · 6.9 mi awayAlamo 5 BESS 1 — Postponed · Storage · TX · 100 MW · 7.0 mi awayNightfall Solar — Built · Solar · TX · 180.9 MW · 7.2 mi awayAlamo 5 BESS 2 — Postponed · Storage · TX · 100 MW · 9.5 mi away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

AP Sunray LLC

Power plant · Solar

Key facts

Power plant · Solarran 24% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
429,906 MWh
Grid
138 kV to Oncor Electric Delivery Company LLC (ERCO)
Location
Uvalde County, Texas
Operated by
AP Sunray LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
2 years since 2024
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000805399
Location id
L100000804682
Eia plant ids
64258
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
Oncor Electric Delivery Company LLC
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20251,466,838
Capacity factor, 20250.241
Net generation (MWh), 2025429,906
Balancing authority codeERCO

Solar arrays

Array area (acres)
1,010.9
AC capacity (MW)
203.5
DC capacity (MW)
270
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2024

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Uvalde 2 BESS 1 Postponed Storage 6.9 mi 75
Uvalde 2 BESS 2 Postponed Storage 6.9 mi 150
Uvalde Solar 2 Announced Solar 6.9 mi 300
Uvalde Solar 1 Postponed Solar 6.9 mi 150
Alamo 5 BESS 1 Postponed Storage 7.0 mi 100
Nightfall Solar Built Solar 7.2 mi 180.9
Alamo 5 BESS 2 Postponed Storage 9.5 mi 100

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution