Show on map
Asheville-Rock Hill Battery — Power plant · Storage · Duke Energy Progress - (NC)Asheville BESS — Under construction · Storage · NC · 17.3 MW · 4.9 mi awayAsheville Solar — Under construction · Solar · NC · 9.5 MW · 5.0 mi awayWoodfin — Postponed · Gas, combustion turbine · NC · 45.5 MW · 7.9 mi awayRiverside BESS — Postponed · Storage · NC · 5 MW · 8.4 mi awayCraggy Energy Storage — Under construction · Storage · NC · 30.5 MW · 8.7 mi away
  • Wind & solar
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Asheville-Rock Hill Battery

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
-209 MWh
Grid
23 kV, 13 kV to Duke Energy Carolinas, LLC (CPLW)
Location
Buncombe County, North Carolina
Operated by
Duke Energy Progress - (NC)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2020 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Storage source: “Batteries”
Age
6 years since 2020
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
22.90, 13.20
Transmission owner
Duke Energy Carolinas, LLC
Balancing authority code
CPLW
Balancing authority name
Duke Energy Progress West
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-209
Balancing authority codeCPLW
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -209.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Asheville BESS Under construction Storage 4.9 mi 17.3
Asheville Solar Under construction Solar 5.0 mi 9.5
Woodfin Postponed Gas, combustion turbine 7.9 mi 45.5
Riverside BESS Postponed Storage 8.4 mi 5
Craggy Energy Storage Under construction Storage 8.7 mi 30.5

Sources EIA-860M · Berkeley Lab

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.

Attribution