Auburndale Peaker Energy Center — Power plant · Gas, combustion turbine · Auburndale Peaker Energy Center LLCLKL Kingfisher, LLC — Postponed · Solar · FL · 6 MW · 5.7 mi awayPace Road Battery Storage — Permitted · Storage · FL · 20 MW · 5.9 mi awayC D McIntosh Jr — Postponed · Oil · FL · 304 MW · 7.4 mi away
  • Combustion
  • Storage
  • In development
  • Retired
  • 10 · 100 · 1,000 MW

Auburndale Peaker Energy Center

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2002
Net generation, 2017
0 MWh
Location
Polk County, Florida

Output

Net generation MWh by year, 2003 to 2018
Fuel burned MMBtu by year, 2003 to 2018
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
24 years since 2002
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110069998649
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000551
Balancing authority codeTEC

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
September 2018
Capacity retired
130.1 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
CTPNatural Gas Fired Combustion Turbine130.1 MWRetiredSeptember 2018

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
TEC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Auburndale Peaker Energy Center LLC Operator EIA-860M
Calpine Corporation Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Unit CTP scheduled to retire, 130.1 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
LKL Kingfisher, LLC Postponed Solar 5.7 mi 6
Pace Road Battery Storage Permitted Storage 5.9 mi 20
C D McIntosh Jr Postponed Oil 7.4 mi 304