Show on map
Avila — Power plant · Storage · ENGIE North AmericaBighorn Ridge Solar — Solar · TX · 300 MW · 12.1 km awaySelenite Springs Solar — Solar · TX · 253 MW · 16.6 km awayOctans — Storage · TX · 125 MW · 24.9 km away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Grid
138 kV to Texas-New Mexico Power Co (ERCO)
Location
Pecos County, Texas
Operated by
ENGIE North AmericaSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
1 year since 2025
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
Texas-New Mexico Power Co
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-4,984
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -4984.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Bighorn Ridge Solar Permitted Solar 12.1 km 300
Selenite Springs Solar Contracted Solar 16.6 km 253
Octans Under construction Storage 24.9 km 125

Sources EIA-860M · ERCOT

Sources

Attribution