Show on map
Back River Waste Water Treatment — Power plant · Biomass · Mayor and City Council of Baltimore City - (MD)Marley Neck 3 - SLBAL005 — Under construction · Solar · MD · 2 MW · 7.9 mi awayMarley Neck 4 - SLBAL006 — Under construction · Solar · MD · 1.4 MW · 7.9 mi awayCONTROL DATA CORP. — Built · Large load · MD · 13.3 mi awayAMAZON DATA SERVICES INC LTW062 — Built · Large load · MD · 14.7 mi away
  • Wind & solar
  • Bioenergy
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Back River Waste Water Treatment

Power plant · Biomass

Key facts

Power plant · Biomassran 2% of 2024 Out of service
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2009
Net generation, 2024
594 MWh
Grid
32 kV to Baltimore Gas & Electric Co (PJM)
Location
Baltimore City County, Maryland
Operated by
Mayor and City Council of Baltimore City - (MD)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2013 to 2024
Fuel burned MMBtu by year, 2013 to 2024
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Other Waste Biomass”
Age
17 years since 2009
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
32
Transmission owner
Baltimore Gas & Electric Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Eia status
By code
OP
Mw
0.800
Units
1
OS
Mw
2.20
Units
2
Standby mw
0
Status rule
majority_mw_out_of_service
In service mw
3
Out of service mw
2.20
Balancing authority codePJM

Solar arrays

Array area (acres)
3.5
AC capacity (MW)
0.8
DC capacity (MW)
1
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2012

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Marley Neck 3 - SLBAL005 Under construction Solar 7.9 mi 2
Marley Neck 4 - SLBAL006 Under construction Solar 7.9 mi 1.4
CONTROL DATA CORP. Built Large load 13.3 mi
AMAZON DATA SERVICES INC LTW062 Built Large load 14.7 mi

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution