Back River Waste Water Treatment — Power plant · Biomass · Mayor and City Council of Baltimore City - (MD)
  • Bioenergy
  • Operating
  • 10 · 100 · 1,000 MW

Back River Waste Water Treatment

Power plant · Biomass

Key facts

Power plant · Biomassran 2% of 2024 Out of service
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2009
Net generation, 2024
594 MWh
Grid
32 kV to Baltimore Gas & Electric Co (PJM)
Location
Baltimore City County, Maryland
Operated by
Mayor and City Council of Baltimore City - (MD)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2024
594MWh
Fuel burned, 2024
2,026MMBtu
Capacity factor, 2024
2.2%
Heat rate, 2024
Not stated
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
20245942,0262.2%—
20239833,3543.7%—
20229983,4043.8%—
20219037,9863.4%—
20202,47428,0859.4%11,352
20192,87935,95411.0%12,488
20187,04195,65826.8%13,586
20175,40088,73120.5%16,432
20165,57592,51721.2%16,595
20154,76377,47218.1%16,265
20147,556107,64628.7%14,246
20137,736118,31029.4%15,293
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)