Backus Microgrid Project — Power plant · Oil · Connecticut Mun Elec Engy CoopCMEEC - Hollyhock Solar — Solar · CT · 6 MW · 1.7 km awayLebanon Solar 2 — Solar · CT · 2 MW · 13.6 km awayLebanon Solar 1 — Solar · CT · 2 MW · 13.7 km awaySubase Microgrid Project — Gas, reciprocating engine · CT · 13.1 MW · 15.9 km awayPlainfield Solar One — Solar · CT · 4 MW · 16.9 km awayGroton Flanders Road Landfill — Solar · CT · 5 MW · 21.7 km away
  • Combustion
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Backus Microgrid Project

Power plant · Oil

Key facts

Power plant · Oilran 1% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2014
Net generation, 2025
638 MWh
Grid
14 kV to City of Norwich - (CT) (ISNE)
Location
New London County, Connecticut
Operated by
Connecticut Mun Elec Engy CoopSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2014 to 2026
Fuel burned MMBtu by year, 2014 to 2026
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
12 years since 2014
Unused energy
90 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
9,845 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
13.80
Transmission owner
City of Norwich - (CT)
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 20256,281
Capacity factor, 20250.007
Heat rate (Btu/kWh), 20259,844.8
Net generation (MWh), 2025638
Balancing authority codeISNE

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
CMEEC - Hollyhock Solar Postponed Solar 1.7 km 6
Lebanon Solar 2 Postponed Solar 13.6 km 2
Lebanon Solar 1 Postponed Solar 13.7 km 2
Subase Microgrid Project Postponed Gas, reciprocating engine 15.9 km 13.1
Plainfield Solar One Under construction Solar 16.9 km 4
Groton Flanders Road Landfill Under construction Solar 21.7 km 5

Sources EIA-860M

Sources

Attribution