Bates Mill Upper — Power plant · Hydro · Lewiston, City of - (ME)Auburn PV - BD Solar Auburn LLC — Solar · ME · 5 MW · 8.2 km awayLewiston Jn PV - BD Solar Lewiston Jn LL — Solar · ME · 5 MW · 8.2 km awayDynamic - Wales Pond Road — Solar · ME · 4.9 MW · 15.0 km awayTurner Meadow Solar Station — Solar · ME · 19.8 MW · 15.6 km awayTopsham Meadow Solar Station — Solar · ME · 17.2 MW · 21.4 km away
  • Clean firm
  • Wind & solar
  • In development
  • Retired
  • 10 · 100 · 1,000 MW

Bates Mill Upper

Power plant · Hydro

Key facts

Power plant · Hydro Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1986
Net generation, 2014
0 MWh
Grid
0.6 kV to Central Maine Power Co (ISNE)
Location
Androscoggin County, Maine
Operated by
Lewiston, City of - (ME)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2014

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
40 years since 1986
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeISNE

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
September 2006
Capacity retired
3.9 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
BU1Conventional Hydroelectric1.2 MWRetiredSeptember 2006
BU2Conventional Hydroelectric1.5 MWRetiredSeptember 2006
BU3Conventional Hydroelectric1.2 MWRetiredSeptember 2006

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
1 kV
Transmission or distribution system owner
Central Maine Power Co
Balancing authority
ISO New England Inc.
NERC region
NPCC
Transmission lines within 25 km (7)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units BU1, BU2, BU3 scheduled to retire, 3.9 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Auburn PV - BD Solar Auburn LLC Filed Solar 8.2 km 5
Lewiston Jn PV - BD Solar Lewiston Jn LL Filed Solar 8.2 km 5
Dynamic - Wales Pond Road Postponed Solar 15.0 km 4.9
Turner Meadow Solar Station Permitted Solar 15.6 km 19.8
Topsham Meadow Solar Station Filed Solar 21.4 km 17.2

Sources EIA-860M