Bates Mill Upper: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Bates Mill Upper
Power plant · Hydro
Key facts
Power plant · Hydro Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1986
- Net generation, 2014
- 0 MWh
- Grid
- 0.6 kV to Central Maine Power Co (ISNE)
- Location
- Androscoggin County, Maine
- Operated by
- Lewiston, City of - (ME)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2014
- 0
MWh - Fuel burned, 2014
- 0
MMBtu - Capacity factor, 2014
- Not stated
- Heat rate, 2014
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2014 | 0 | 0 | — | — |
| 2013 | 0 | 0 | — | — |
| 2012 | 0 | 0 | — | — |
| 2011 | 0 | 0 | — | — |
| 2010 | 0 | 0 | — | — |
| 2009 | 0 | 0 | — | — |
| 2008 | 0 | 0 | — | — |
| 2007 | 0 | 0 | — | — |
| 2006 | 539 | 5,345 | 1.6% | — |
| 2005 | 3,045 | 30,447 | 8.9% | — |
| 2004 | 0 | 0 | — | — |
| 2003 | 0 | 0 | — | — |
| 2002 | 4,750 | 48,322 | 13.9% | — |
| 2001 | 4,660 | 48,152 | 13.6% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.