Show on map
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Bell Rock Road 115 kV line: route and 14 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Bell Rock Road 115 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 115 kV
- States crossed
- US-MA
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 8
- Substations at the ends (as the source names them)
- Bell Rock Road
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| HIFLD line ID | 101113 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| CONGRUITY 360 LLC Built | Large load | 1.5 mi | |
| Tiverton Power Plant Postponed | Gas, combined cycle | 1.8 mi | 289.8 |
| Borrego - Highland Ave Under construction | Solar + storage | 2.9 mi | 10 |
| Salt Cod BESS Filed | Storage | 3.2 mi | 168 |
| Braley Hill North Solar Under construction | Solar + storage | 9.8 mi | 10 |
| Clems Way Solar Permitted | Solar | 9.9 mi | 5 |
| Featherbed Lane South Solar Under construction | Solar + storage | 10.0 mi | 2 |
| MA Acushnet 540R Main St Filed | Solar + storage | 10.3 mi | 6 |
| Snipatuit Road Solar Under construction | Solar + storage | 10.8 mi | 8 |
| Logging Swamp North Permitted | Solar | 10.9 mi | 5 |
| Cushman Road Solar Filed | Solar + storage | 10.9 mi | 6 |
| Logging Swamp South Permitted | Solar | 11.0 mi | 5 |
| Randall Lane Solar Under construction | Solar + storage | 12.9 mi | 10 |
| BlueWave Capital-Mattapoisett (SREC II) Postponed | Solar | 13.3 mi | 4.5 |
Sources EPA ICIS-Air · EIA-860M