Show on map
Big Bend — Power plant · Gas, combined cycle · Tampa Electric CoBig Bend III Battery Storage — Storage · FL · 75 MW · 0.1 km awayTampa Electric Co NA 3 — Gas, combustion turbine · FL · 99 MW · 0.5 km awayH L Culbreath Bayside Power Station — Gas, combustion turbine · FL · 503.8 MW · 12.7 km awayTampa Electric Co NA 2 — Gas, combustion turbine · FL · 982 MW · 12.7 km awaySouth Tampa Energy Storage — Storage · FL · 20 MW · 13.3 km awayKeene Branch Solar — Solar · FL · 74.5 MW · 20.3 km away
  • Combustion
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 47% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1970
Net generation, 2025
7,473,386 MWh
Grid
230 kV to Tampa Electric Co (TEC)
Location
Hillsborough County, Florida

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
56 years since 1970
Unused energy
8,268 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
7,020 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Emera Inc
Share pct
100
Gem entity id
E100000000111
Unit ids
G100000100849, G100000100850, G100000100851, G100000100852, G100000403577, G100000409454
Location id
L100000103820
Eia plant ids
645
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110008319505
Subparts reported
D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001492
Fuel burned (MMBtu), 202552,463,697
Capacity factor, 20250.475
Heat rate (Btu/kWh), 20257,020.1
Net generation (MWh), 20257,473,386.0
Balancing authority codeTEC

Solar arrays

Array area (acres)
82.7
AC capacity (MW)
19
DC capacity (MW)
23
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2017

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Retirement

EIA-860M September 2026StatusSome generators are scheduled to retire; most of the plant's capacity is not, so it is shown as operating. As of EIA-860M for September 2026.
Capacity retired
1,066.4 MW
Generators retired
5
Next scheduled retirement
January 2040
Capacity scheduled to retire
486 MW
Generators scheduled to retire
1
Share of in-service capacity scheduled
27%
Capacity still in service
1,797 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GT1Petroleum Liquids18 MWRetiredDecember 2008
GT2Petroleum Liquids78.7 MWRetiredDecember 2008
GT3Petroleum Liquids78.7 MWRetiredDecember 2008
ST2Conventional Steam Coal445.5 MWRetiredDecember 2021
ST3Natural Gas Steam Turbine445.5 MWRetiredApril 2023
ST4Natural Gas Steam Turbine486 MWScheduled to retireJanuary 2040
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Steam Turbine445.5 MW486 MW
Conventional Steam Coal445.5 MW
Petroleum Liquids175.4 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
230 kV
Transmission or distribution system owner
Tampa Electric Co
Balancing authority
Tampa Electric Company
NERC region
SERC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Tampa Electric Co Operator EIA-860M
TECO ENERGY INC Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Unit ST4 scheduled to retire, 486 MW · EIA-860M
  • Stated Unit ST3 scheduled to retire, 445.5 MW · EIA-860M
  • Stated Unit ST2 scheduled to retire, 445.5 MW · EIA-860M
  • Stated Units GT1, GT2, GT3 scheduled to retire, 175.4 MW · EIA-860M
  • In service · EIA-860M

Sources

7 sources

Sources EIA-860M · GEM · LBNL · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Big Bend III Battery Storage Permitted Storage 0.1 km 75
Tampa Electric Co NA 3 Postponed Gas, combustion turbine 0.5 km 99
H L Culbreath Bayside Power Station Postponed Gas, combustion turbine 12.7 km 503.8
Tampa Electric Co NA 2 Postponed Gas, combustion turbine 12.7 km 982
South Tampa Energy Storage Postponed Storage 13.3 km 20
Keene Branch Solar Under construction Solar 20.3 km 74.5

Sources EIA-860M

Sources

Attribution