Biltmore Solar Fields
Power plant · Solar
Key facts
Power plant · Solarran 2% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2012
- Net generation, 2025
- 234 MWh
- Grid
- 12 kV to Duke Energy Progress - (NC) (CPLW)
- Location
- Buncombe County, North Carolina
- Operated by
- The Biltmore Company
Output
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 14 years since 2012
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 799 |
| Capacity factor, 2025 | 0.018 |
| Net generation (MWh), 2025 | 234 |
| Balancing authority code | CPLW |
Solar array
Solar array
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 7.1
- AC capacity (MW)
- 1.5
- DC capacity (MW)
- 1.7
- Mounting
- Fixed tilt
- Site type
- Greenfield
- Began operating
- 2012
Ownership
3 companies3| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| The Biltmore Company | Operator | EIA-860M | ||
| Biltmore Natural Resources, LLC | Owner | 60.0% | Dec 31, 2025 | EIA-860 |
| Biltmore Energy Company, LLC | Owner | 40.0% | Dec 31, 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Riverside BESS Postponed | Storage | 5.6 mi | 5 |
| Craggy Energy Storage Under construction | Storage | 5.7 mi | 30.5 |
| Woodfin Postponed | Gas, combustion turbine | 6.4 mi | 45.5 |
| Asheville BESS Under construction | Storage | 6.7 mi | 17.3 |
| Asheville Solar Under construction | Solar | 6.8 mi | 9.5 |
Sources EIA-860M · Berkeley Lab
Sources
- EIA-860M
- Berkeley LabLawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.