Biltmore Solar Fields — Power plant · Solar · The Biltmore CompanyRiverside BESS — Postponed · Storage · NC · 5 MW · 5.6 mi awayCraggy Energy Storage — Under construction · Storage · NC · 30.5 MW · 5.7 mi awayWoodfin — Postponed · Gas, combustion turbine · NC · 45.5 MW · 6.4 mi awayAsheville BESS — Under construction · Storage · NC · 17.3 MW · 6.7 mi awayAsheville Solar — Under construction · Solar · NC · 9.5 MW · 6.8 mi away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Biltmore Energy Company, LLC

Follow this company

Power plant owner

Key facts

Power plant owner · 1.5 MW
Assets
1
States
NC
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.0% of the output is from 0 plants recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2016 to 2025
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearSolarTotal (MWh)
2025234234
202400
202300
2022385385
20211,5861,586
2020971971
20191,1891,189
20181,9591,959
201700
201600

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 1

Assets

1

Capacity

1.5 MW

MW by fuel
  1. Solar: 1.5 MW, 1 asset

Owns 1 power plant

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 5

within 15 mi

Projects

5

within 15 mi

Nearest

5.6 mi

Riverside BESS

All 5NearbyShowing all 5 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Riverside BESS Storage 5 MW 5.6 mi away nearest: Biltmore Solar Fields
Under construction Craggy Energy Storage Storage 30.5 MW 5.7 mi away nearest: Biltmore Solar Fields
Postponed Woodfin Gas, combustion turbine 45.5 MW 6.4 mi away nearest: Biltmore Solar Fields
Under construction Asheville BESS Storage 17.3 MW 6.7 mi away nearest: Biltmore Solar Fields
Under construction Asheville Solar Solar 9.5 MW 6.8 mi away nearest: Biltmore Solar Fields

Sources EIA-860M · Berkeley Lab

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.

Every source and license · Attribution