Blacklick Substation 138 kV line — Transmission lineCMH050 — Built · Large load · OH · 7.1 mi awaySTACK NAL01B (New Albany data centre) — Filed · Large load · OH · 7.4 mi awayCMH082 CAMPUS — Built · Large load · OH · 7.9 mi awayVantage OH 12 — Filed · Large load · OH · 8.1 mi awayFlint — Under construction · Storage · OH · 200 MW · 8.3 mi awaySouth Site Data Center Energy Center — Filed · Large load · OH · 8.5 mi awayCyrusOne COL-1 — Filed · Large load · OH · 8.7 mi awayCMH137 — Filed · Large load · OH · 8.7 mi awayBZI Crane (ECX CMH03) — Filed · Large load · OH · 8.9 mi awayCMH03 — Filed · Large load · OH · 9.3 mi awayUnion Ridge Solar — Under construction · Solar · OH · 108 MW · 10.0 mi awayCOLOGIX — Built · Large load · OH · 12.2 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Blacklick Substation 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-OH

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
1
Substations at the ends (as the source names them)
Blacklick Substation
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID107551
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CMH050 Built Large load 7.1 mi
STACK NAL01B (New Albany data centre) Filed Large load 7.4 mi
CMH082 CAMPUS Built Large load 7.9 mi
Vantage OH 12 Filed Large load 8.1 mi
Flint Under construction Storage 8.3 mi 200
South Site Data Center Energy Center Filed Large load 8.5 mi
CyrusOne COL-1 Filed Large load 8.7 mi
CMH137 Filed Large load 8.7 mi
BZI Crane (ECX CMH03) Filed Large load 8.9 mi
CMH03 Filed Large load 9.3 mi
Union Ridge Solar Under construction Solar 10.0 mi 108
COLOGIX Built Large load 12.2 mi