Blakely (PA) RTO BTM
Power plant · Oil
Key facts
Power plant · Oilran 1% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2022
- Net generation, 2025
- 279 MWh
- Grid
- 12 kV to Borough of Blakely - (PA) (PJM)
- Location
- Lackawanna County, Pennsylvania
- Operated by
- American Mun Power-Ohio, IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 279
MWh - Fuel burned, 2025
- 2,440
MMBtu - Capacity factor, 2025
- 0.6
% - Heat rate, 2025
- 8,746
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 279 | 2,440 | 0.6% | 8,746 |
| 2024 | 282 | 2,489 | 0.6% | 8,826 |
| 2023 | 128 | 1,048 | 0.3% | 8,188 |
| 2022 (1 of 12 months) | 62 | 541 | — | 8,726 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.