American Mun Power-Ohio, Inc
Public agency
Key facts
Public agency · 3,558.7 MW- Capacity held
- 3,558.7MW
- Assets
- 51
- States
- IL, KY, OH, PA, WV
- Registered in
- United States
- Parent
- No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why
Gross output of plants with a stake
34 of 34 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 34 of 34 plants with a stake: US plants with an EIA monthly series.5% of the output is from 31 plants recorded as wholly owned.31 plants: operator, wholly owned per EIA-860.Not included: 17 plants it operates without a recorded stake.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Coal
- Oil
- Hydro
- Solar
Yearly totals
| Year | Coal | Oil | Hydro | Solar | Total (MWh) |
|---|---|---|---|---|---|
| 2026 (part year) | 8,393,362 | — | 279,820 | — | 8,673,182 |
| 2025 | 12,192,564 | 5,610 | 1,687,587 | 4,214 | 13,889,975 |
| 2024 | 11,447,748 | 5,835 | 1,676,341 | 4,619 | 13,134,543 |
| 2023 | 12,483,004 | 2,639 | 1,912,326 | 4,555 | 14,402,524 |
| 2022 | 11,608,888 | 2,144 | 1,978,828 | 4,676 | 13,594,536 |
| 2021 | 12,685,744 | 1,821 | 2,224,851 | 4,937 | 14,917,353 |
| 2020 | 11,308,063 | 1,754 | 1,652,547 | 4,458 | 12,966,822 |
| 2019 | 12,053,090 | 1,214 | 1,554,035 | 4,409 | 13,612,748 |
| 2018 | 11,532,418 | 1,733 | 1,417,339 | 3,736 | 12,955,226 |
| 2017 | 10,810,692 | 1,209 | 1,628,022 | 4,905 | 12,444,828 |
| 2016 | 10,619,157 | 1,563 | 1,291,925 | 4,888 | 11,917,533 |
| 2015 | 11,106,837 | 1,227 | 228,454 | 5,111 | 11,341,629 |
| 2014 | 9,664,791 | 591 | 203,740 | 5,147 | 9,874,269 |
| 2013 | 8,350,518 | 1,225 | 320,001 | 5,262 | 8,677,006 |
| 2012 | 3,263,897 | 1,816 | 261,327 | 567 | 3,527,607 |
| 2011 | — | 1,286 | 242,082 | — | 243,368 |
| 2010 | — | 573 | 272,415 | — | 272,988 |
| 2009 | — | 269 | 311,711 | — | 311,980 |
| 2008 | — | 386 | 247,304 | — | 247,690 |
| 2007 | — | 1,182 | 222,613 | — | 223,795 |
| 2006 | — | 1,341 | 335,283 | — | 336,624 |
| 2005 | — | 3,340 | 294,787 | — | 298,127 |
| 2004 | — | 1,521 | 214,368 | — | 215,889 |
| 2003 | — | 5,146 | 234,987 | — | 240,133 |
| 2002 | — | 4,020 | 284,629 | — | 288,649 |
| 2001 | — | — | 299,843 | — | 299,843 |
Assets 51
Assets
51
Capacity
3,559 MW
- Coal: 1,966 MW, 2 assets
- Gas, combined cycle: 740 MW, 1 asset
- Hydro: 425 MW, 6 assets
- Gas, combustion turbine: 212 MW, 5 assets
- Oil: 205 MW, 35 assets
- Other: 10.7 MW, 2 assets
Operates 48 power plants · Owns 3 power plants
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Sources 2
Registers
2
Reuse terms
- 1 Open license
- 1 Open license, with credit
Latest read
2026-10-30
From its recordsSourcesThe registers behind this company's assets, projects and RFPs; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 41
within 15 miProjects
41
within 15 mi
Nearest
0.7 mi
Oppidan BG Data Center
All 41NearbyShowing all 41 nearby projects. They fill 40 rows, as a project's generator units share a row.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Filed | Oppidan BG Data Center | Large load | — | 0.7 mi away | nearest: Bowling Green |
| Under construction | West Point (PA) | Gas, reciprocating engine | 2.5 MW | 4.0 mi away | nearest: Hatfield PA BTM |
| Under construction | Firelands Wind | Wind | 297 MW | 4.3 mi away | nearest: Monroeville RTO BTM |
| Announced | Henry Solar | Solar | 206 MW | 4.5 mi away | nearest: Napoleon |
| Under construction | Juliet Energy Project, LLC | Solar | 50 MW | 4.7 mi away | nearest: Bowling Green Wind |
| Under construction | Bee Hollow Solar, LLC | Solar | 150 MW | 5.4 mi away | nearest: Prairie State Generating Station |
| Postponed | Black Fork Wind Energy Project | Wind | 200 MW | 5.9 mi away | nearest: Shelby North |
| Postponed | PA Solar Park | Solar | 9.9 MW | 6.2 mi away | nearest: Weatherly(PA) RTO BTM |
| Built | ARK DATA CENTERS | Large load | — | 6.5 mi away | nearest: Engle |
| Postponed | Broad Mountain Wind Project | Wind | 80 MW | 6.6 mi away | nearest: Weatherly(PA) RTO BTM |
| Announced | Sculpin Solar | Solar | 180 MW | 7.1 mi away | nearest: Edgerton |
| Postponed | SunCoke Energy South Shore Facility | Coal | 90 MW | 7.2 mi away | nearest: Greenup Hydro |
| Postponed | Devola L&D Hydroelectric Project | Hydro | 4 MW | 7.3 mi away | nearest: Richard Gorsuch |
| Under construction | Trenton Solar - (OH) | Solar | 9.5 MW | 7.6 mi away | nearest: Hamilton Peaking |
| Under construction | Franklin White Church Road Solar LLC | Solar | 3 MW | 9.3 mi away | nearest: Mifflinburg PA BTM |
| Under construction | Great Plains Solar, LLC | Solar | 100 MW | 9.3 mi away | nearest: Prairie State Generating Station |
| Announced | Richwood Solar and Storage × 2 units | Storage | 300 MW | 9.7 mi away | nearest: Prospect Municipal |
| Under construction | Snapdragon Solar, LLC | Solar | 28 MW | 9.7 mi away | nearest: Prairie State Generating Station |
| Filed | Crane Type - Manitowoc MLC-650 (Lancaster data centre) | Large load | — | 10.8 mi away | nearest: Ephrata PA BTM |
| Postponed | Lowell L&D Hydroelectric Project | Hydro | 5 MW | 11.2 mi away | nearest: Richard Gorsuch |
| Filed | Data Center | Large load | — | 11.3 mi away | nearest: Weatherly(PA) RTO BTM |
| Postponed | Icebreaker Offshore Wind Farm | Offshore wind | 20.4 MW | 11.7 mi away | nearest: Cleveland Peaking |
| Under construction | Perry Route 104 Solar LLC | Solar | 3 MW | 12.0 mi away | nearest: Mifflinburg PA BTM |
| Postponed | Wolf Creek Solar | Solar + storage | 300 MW | 12.2 mi away | nearest: Richard Gorsuch |
| Postponed | Northumberland Solar | Storage | 20 MW | 12.2 mi away | nearest: Mifflinburg PA BTM |
| Under construction | MCCo BESS Generating Facility | Storage | 15.6 MW | 12.4 mi away | nearest: Engle |
| Built | VALLEY FORGE DIGITAL UTILITY FACILITY / LOWER PROVIDENCE | Large load | — | 12.6 mi away | nearest: Hatfield PA BTM |
| Under construction | Mark Center Solar Project | Solar | 90 MW | 12.7 mi away | nearest: Bryan Peaking |
| Postponed | Hardinsburg Electric Generating Station | Gas, combustion turbine | 472 MW | 12.8 mi away | nearest: Cannelton Hydroelectric Plant |
| Announced | Mora Solar | Solar | 60 MW | 12.8 mi away | nearest: Weatherly(PA) RTO BTM |
| Filed | New Frontiers Solar | Solar | 100 MW | 13.0 mi away | nearest: Cannelton Hydroelectric Plant |
| Built | FLEXENTIAL/ UPPER PROVIDENCE TWP | Large load | — | 13.2 mi away | nearest: Hatfield PA BTM |
| Postponed | Matador Solar | Solar + storage | 300 MW | 13.2 mi away | nearest: Niles |
| Filed | PF Onsite BESS | Storage | 21 MW | 13.3 mi away | nearest: Weatherly(PA) RTO BTM |
| Built | INNOVATION 2201 LLC / UPPER MERION TWP | Large load | — | 13.4 mi away | nearest: Hatfield PA BTM |
| Permitted | Beaver Gross Road Solar LLC | Solar | 3 MW | 13.6 mi away | nearest: Mifflinburg PA BTM |
| Built | CSL BEHRING DATA CTR/KING OF PRUSSIA | Large load | — | 14.0 mi away | nearest: Hatfield PA BTM |
| Postponed | Beverly L&D Hydroelectric Project | Hydro | 3 MW | 14.7 mi away | nearest: Richard Gorsuch |
| Postponed | Hop Bottom | Gas, reciprocating engine | 43 MW | 14.7 mi away | nearest: Blakely (PA) RTO BTM |
| Postponed | Good Spring NGCC Facility | Gas, combined cycle | 358 MW | 14.9 mi away | nearest: Schuylkill Haven PA BTM |
Sources FAA OE/AAA · EIA-860M · EPA ICIS-Air