Show on map
Bluebonnet — Power plant · Biomass · TX LFG Energy, LPTX Houston 7080 Express Lane — Postponed · Storage · TX · 1.5 MW · 1.7 km awayGreens Bayou 6 — Under construction · Gas, combustion turbine · TX · 445 MW · 3.7 km awayCPV Pondera King Energy Center — Postponed · Gas, combined cycle · TX · 900 MW · 11.5 km awayTexas Petrochemicals — Postponed · Gas, combined cycle · TX · 560 MW · 12.5 km awayBESS TX Camarine - BSHOU001 — Under construction · Storage · TX · 9.9 MW · 18.1 km awayTX LaPort 10060 Porter Road Solar — Postponed · Solar · TX · 1.6 MW · 21.5 km awaySMT DC Houston II (Houston data centre) — Filed · Large load · TX · 24.9 km away
  • Combustion
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Biomass

Key facts

Power plant · Biomassran 15% of 2015 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2003
Net generation, 2015
5,359 MWh
Grid
12 kV to CenterPoint Energy (ERCO)
Location
Harris County, Texas
Operated by
TX LFG Energy, LPSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2003 to 2016
Fuel burned MMBtu by year, 2003 to 2016
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
23 years since 2003
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeERCO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
April 2016
Capacity retired
4 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
UNT1Landfill Gas1 MWRetiredApril 2016
UNT2Landfill Gas1 MWRetiredApril 2016
UNT3Landfill Gas1 MWRetiredApril 2016
UNT4Landfill Gas1 MWRetiredApril 2016

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV
Transmission or distribution system owner
CenterPoint Energy
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
Transmission lines within 25 km (10)
Connection points within 25 km (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units UNT1, UNT2, UNT3, UNT4 scheduled to retire, 4 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · OpenStreetMap · ERCOT · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

© OpenStreetMap contributors

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
TX Houston 7080 Express Lane Postponed Storage 1.7 km 1.5
Greens Bayou 6 Under construction Gas, combustion turbine 3.7 km 445
CPV Pondera King Energy Center Postponed Gas, combined cycle 11.5 km 900
Texas Petrochemicals Postponed Gas, combined cycle 12.5 km 560
BESS TX Camarine - BSHOU001 Under construction Storage 18.1 km 9.9
TX LaPort 10060 Porter Road Solar Postponed Solar 21.5 km 1.6
SMT DC Houston II (Houston data centre) Filed Large load 24.9 km

Sources EIA-860M · ERCOT · FAA OE/AAA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 9, 2026