Blythe Solar III, LLC Hybrid
Power plant · Solar
Key facts
Power plant · Solarran 16% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2020
- Net generation, 2025
- 354,627 MWh
- Grid
- 220 kV to Southern California Edison Co (CISO)
- Location
- Riverside County, California
- Operated by
- Blythe Solar III, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 354,627
MWh - Fuel burned, 2025
- 1,261,519
MMBtu - Capacity factor, 2025
- 16.1
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2026 (8 of 12 months) | 246,016 | 875,929 | — | — |
| 2025 | 354,627 | 1,261,519 | 16.1% | — |
| 2024 | 349,412 | 1,228,863 | 15.8% | — |
| 2023 | 296,116 | 1,054,764 | 13.4% | — |
| 2022 | 304,891 | 1,100,805 | 13.8% | — |
| 2021 | 325,512 | 2,910,436 | 14.8% | — |
| 2020 (8 of 12 months) | 223,126 | 1,956,146 | — | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.