Show on map
Blythe Solar III, LLC Hybrid — Power plant · Solar · Blythe Solar III, LLCBlythe Solar Power Project — Withdrawn · Solar thermal · CA · 796.8 MW · 1.2 mi awayGrace Energy Center — Contracted · Solar + storage · CA · 500 MW · 2.7 mi awaySonoran Energy Project — Postponed · Gas, combined cycle · CA · 553 MW · 4.3 mi awaySonoran West Solar EGS — Withdrawn · Solar · CA · 540 MW · 9.3 mi awayChuckawalla State Prison — Postponed · Solar · CA · 2.1 MW · 12.1 mi awayIronwood State Prison — Postponed · Solar · CA · 1.1 MW · 12.4 mi awayRio Mesa SEGF 2 — Postponed · Solar thermal · CA · 250 MW · 13.4 mi awayRio Mesa Solar Facility 1 — Postponed · Solar thermal · CA · 250 MW · 14.3 mi away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Blythe Solar III, LLC Hybrid

Power plant · Solar

Key facts

Power plant · Solarran 16% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
354,627 MWh
Grid
220 kV to Southern California Edison Co (CISO)
Location
Riverside County, California
Operated by
Blythe Solar III, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2020 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
6 years since 2020
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
220
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20251,261,519
Capacity factor, 20250.161
Net generation (MWh), 2025354,627
Balancing authority codeCISO

Solar array

Array area (acres)
1,101.5
AC capacity (MW)
137.4
DC capacity (MW)
154
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2020

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Blythe Solar Power Project Withdrawn Solar thermal 1.2 mi 796.8
Grace Energy Center Contracted Solar + storage 2.7 mi 500
Sonoran Energy Project Postponed Gas, combined cycle 4.3 mi 553
Sonoran West Solar EGS Withdrawn Solar 9.3 mi 540
Chuckawalla State Prison Postponed Solar 12.1 mi 2.1
Ironwood State Prison Postponed Solar 12.4 mi 1.1
Rio Mesa SEGF 2 Postponed Solar thermal 13.4 mi 250
Rio Mesa Solar Facility 1 Postponed Solar thermal 14.3 mi 250

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 19, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution