Show on map
BMP Wind (TX) — Power plant · Wind · BMP Wind, LLCEnbridge Solar (Sequoia II) — Solar · TX · 415 MW · 12.5 km away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

BMP Wind (TX)

Power plant · Wind

Key facts

Power plant · Windran 29% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
870,423 MWh
Grid
345 kV to AEP Texas Central Company (ERCO)
Location
Callahan County, Texas
Operated by
BMP Wind, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
5 years since 2021
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000910261
Location id
L100000907618
Eia plant ids
62809
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
345
Transmission owner
AEP Texas Central Company
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20252,969,883
Capacity factor, 20250.292
Net generation (MWh), 2025870,423
Balancing authority codeERCO

Wind turbines

Turbines
68
Turbine capacity (MW)
340
Turbine models
68 Siemens Gamesa Renewable Energy SG-5.0-145
Hub height (m)
90
Rotor diameter (m)
145
Year online
2021

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Enbridge Solar (Sequoia II) Under construction Solar 12.5 km 415

Sources EIA-860M

Sources

Attribution