BMP Wind, LLC
Independent power producer
Key facts
Independent power producer · 340 MW- Capacity held
- 340MW
- Assets
- 1
- Projects
- 1
- States
- TX
- Registered in
- United States
- Parent
- No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why
Gross output of plants with a stake
1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Wind
Yearly totals
| Year | Wind | Total (MWh) |
|---|---|---|
| 2026 (part year) | 694,373 | 694,373 |
| 2025 | 870,423 | 870,423 |
| 2024 | 690,212 | 690,212 |
| 2023 | 780,755 | 780,755 |
| 2022 | 719,597 | 719,597 |
| 2021 (part year) | 66,615 | 66,615 |
Sources EIA-860 · EIA-860M · EIA
Sources
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
Projects 1
Capacity
0.34 GW
none active
| Status | Name. Sort by name, A to Z | Type | MW, sorted descending. Sort by capacity, smallest first | State | Online. Sort by proposed online date, latest first | Source |
|---|---|---|---|---|---|---|
| Built | Baird North Wind | Wind | 340 MW | TX | Online 31 Dec 2026 | ERCOT |
Assets 1
Assets
1
Capacity
340 MW
- Wind: 340 MW, 1 asset
Operates 1 power plant
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Held by |
|---|---|---|---|---|---|
| BMP Wind (TX) | Wind | Operates | 340 MW | US-TX | BMP Wind, LLC |
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Sources 3
Registers
3
Reuse terms
- 2 Open license
- 1 Open license, with credit
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
-
View at source →
ERCOT ·
ERCOT GIS Report (Generator Interconnection Status)
ERCOT Website User Agreement clause 5, retrieved 2026-09-12 — "raw data provided in public portions of this website may be used, reproduced, and redistributed in compilations, charts, and analyses without maintaining such notices"
Around this company
Nearby 1
within 25 kmProjects
1
within 25 km
Nearest
12.5 km
Enbridge Solar (Sequoia II)
All 1NearbyShowing all 1 nearby project.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Under construction | Enbridge Solar (Sequoia II) | Solar | 415 MW | 12.5 km away | nearest: BMP Wind (TX) |