Boardman — Power plant · Coal · Portland General Electric CoTutuilla Solar — Solar · OR · 1.6 MW · 11.8 km awayPDX154 Campus — Large load · OR · 13.3 km awayWheatridge Optimization II — Solar + storage · OR · 190 MW · 20.4 km awayWheatridge Optimization I — Solar + storage · OR · 175 MW · 20.7 km awaySunstone Solar — Solar + storage · OR · 2,400 MW · 21.4 km away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Coal

Key facts

Power plant · Coalran 29% of 2020 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1980
Net generation, 2020
1,632,318 MWh
Grid
500 kV to Bonneville Power Administration (PGE)
Location
Morrow County, Oregon

Output

Net generation MWh by year, 2001 to 2020
Fuel burned MMBtu by year, 2001 to 2020
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
46 years since 1980
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Portland General Electric Co
Share pct
90
Gem entity id
E100000002305
Name
IDACORP Inc
Share pct
10
Gem entity id
E100000001235
Unit ids
G100000100970
Location id
L100000104128
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000488838
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1007940
Balancing authority codePGE

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
October 2020
Capacity retired
642.2 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Conventional Steam Coal642.2 MWRetiredOctober 2020

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
500 kV
Transmission or distribution system owner
Bonneville Power Administration
Balancing authority
Portland General Electric Company
NERC region
WECC
Transmission lines within 25 km (3)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

3 companies5
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Portland General Electric Co Operator EIA-860M
Portland General Electric Co Owner 90.0% 31 Dec 2023 EPA GHGRP
IDACORP INC Owner 10.0% 31 Dec 2023 EPA GHGRP
Idaho Power Co Owner 10.0% 31 Dec 2025 EIA-860
Portland General Electric Co Owner 90.0% 31 Dec 2025 EIA-860

Timeline

  • Stated Unit 1 scheduled to retire, 642.2 MW · EIA-860M
  • In service · EIA-860M

Sources

7 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Tutuilla Solar Under construction Solar 11.8 km 1.6
PDX154 Campus Filed Large load 13.3 km
Wheatridge Optimization II Under construction Solar + storage 20.4 km 190
Wheatridge Optimization I Under construction Solar + storage 20.7 km 175
Sunstone Solar Filed Solar + storage 21.4 km 2,400