- Combustion
- Loads
- In development
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Loads
- In development
- Operating
- Size not stated
Bowen: location and 2 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Bowen
Power plant · Coal
Key facts
Power plant · Coalran 40% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1971
- Net generation, 2025
- 12,258,801 MWh
- Grid
- 500 kV, 230 kV to Georgia Power Co (SOCO)
- Location
- Bartow County, Georgia
- Operated by
- Georgia Power Co
Output
- Coal
- Oil
Details
Who’s behind it
- Owner
- Southern CO
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Coal source: “Conventional Steam Coal”
- Age
- 55 years since 1971
- Unused energy
- 18,389 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 9,831 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 120,514,556 |
| Capacity factor, 2025 | 0.400 |
| Heat rate (Btu/kWh), 2025 | 9,830.9 |
| Net generation (MWh), 2025 | 12,258,800.6 |
| Balancing authority code | SOCO |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 41.8 MW
- Generators retired
- 1
- Capacity still in service
- 3,498.6 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 6 | Petroleum Liquids | 41.8 MW | Retired | April 2013 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 500 kV, 230 kV
- Transmission or distribution system owner
- Georgia Power Co
- Balancing authority
- Southern Company Services, Inc. - Trans
- NERC region
- SERC
Transmission lines within 25 km (10)
- Bowen Substation 230 kV line
- Bowen Substation - Big Shanty 500 kV
- Bowen Substation 230 kV line
- Bowen Substation 230 kV line
- Bowen Substation - Big Shanty 500 kV
- Bowen Substation 500 kV line
- Bowen Substation 230 kV line
- Bowen Substation - Hammond Station 230 kV
- Bowen Substation - Villa Rica 500 kV
- Bowen Substation - Villa Rica 500 kV
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Georgia Power Co | Operator | EIA-860M | ||
| SOUTHERN CO | Owner | 100.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- Stated Unit 6 scheduled to retire, 41.8 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| THE KEEP 2 CAMPUS Filed | Large load | 12.1 km | |
| Aragon Energy Storage Postponed | Storage | 14.3 km | 225 |