Broad Mountain — Power plant · Biomass · Hunlock Creek Generating, LLCGood Spring NGCC Facility — Postponed · Gas, combined cycle · PA · 358 MW · 5.3 mi awayWMPI Pty LLC — Postponed · Coal · PA · 41 MW · 8.5 mi away
  • Bioenergy
  • Retired
  • 10 · 100 · 1,000 MW

Broad Mountain

Power plant · Biomass

Key facts

Power plant · Biomassran 46% of 2022 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2009
Net generation, 2022
44,130 MWh
Location
Schuylkill County, Pennsylvania

Output

Net generation MWh by year, 2009 to 2023
Fuel burned MMBtu by year, 2009 to 2023
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
17 years since 2009
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110045952581
Subparts reported
C
NAICS code
221117
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1011225
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
October 2023
Capacity retired
11 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Landfill Gas5.5 MWRetiredOctober 2023
GEN2Landfill Gas5.5 MWRetiredOctober 2023

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
PJM
Transmission lines within 15 mi (4)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Hunlock Creek Generating, LLC Operator EIA-860M
UGI CORP Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units GEN1, GEN2 scheduled to retire, 11 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Good Spring NGCC Facility Postponed Gas, combined cycle 5.3 mi 358
WMPI Pty LLC Postponed Coal 8.5 mi 41

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026