Show on map
- Combustion
- Loads
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Loads
- Operating
- Size not stated
Brookside Newark: location and 6 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Brookside Newark
Power plant · Gas, other
Key facts
Power plant · Gas, otherran 90% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2012
- Net generation, 2025
- 20,540 MWh
- Grid
- 12 kV to Delmarva Power (PJM)
- Location
- New Castle County, Delaware
- Operated by
- Diamond State Generation Partners, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, other source: “Other Natural Gas”
- Age
- 14 years since 2012
- Heat rate
- 6,744 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 138,511 |
| Capacity factor, 2025 | 0.902 |
| Heat rate (Btu/kWh), 2025 | 6,743.5 |
| Net generation (MWh), 2025 | 20,540 |
| Balancing authority code | PJM |
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| DXC TECHNOLOGY SERVICES LLC Built | Large load | 5.5 km | |
| JP MORGAN CHASE - BEAR CHRISTIANA ROAD Built | Large load | 5.6 km | |
| LNH INC DBA HOSTING.COM - 350 PENCADER Built | Large load | 7.4 km | |
| LNH INC DBA HOSTING.COM - 650 PENCADER Built | Large load | 7.5 km | |
| Deepwater Postponed | Gas, combustion turbine | 17.9 km | 456 |
| JP MORGAN CHASE - 4001 GOVERNOR PRINTZ BLVD Built | Large load | 19.3 km |