Show on map
BUCKEYE TERMINALS LLC, TAYLOR EAST — Petroleum product terminalProject Cannoli Data Center — Filed · Large load · MI · 8.4 mi awayTrenton Channel Energy Center — Under construction · Storage · MI · 220 MW · 10.1 mi awayCity of Detroit Greenfield — Permitted · Solar · MI · 7 MW · 14.5 mi awayEast Windsor cogeneration centre 2 — Under construction · Gas, combustion turbine · Canada · 100 MW · 14.8 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Buckeye Terminals LLC, Taylor East

Petroleum product terminal

As filed: BUCKEYE TERMINALS LLC, TAYLOR EAST

Key facts

Petroleum product terminal Operating
Location
Michigan

Details

Who’s behind it

Owner
Buckeye Terminals LLCSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Capacity not stated

All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Attributes
AttributeValue
Padd2
SiteTAYLOR EAST
SurveyEIA-815
Owner, as the source states itBUCKEYE TERMINALS LLC
Source release202109

Sources

2 sources

Sources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Sources

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Project Cannoli Data Center Filed Large load 8.4 mi
Trenton Channel Energy Center Under construction Storage 10.1 mi 220
City of Detroit Greenfield Permitted Solar 14.5 mi 7
East Windsor cogeneration centre 2 Under construction Gas, combustion turbine 14.8 mi 100

Sources FAA OE/AAA · Berkeley Lab · EIA-860M · GEM

Sources

  • FAA OE/AAAOpen license · retrieved Nov 16, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution