Trenton Channel Energy Center
Storage
Status not current MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0)
Status not current
The status is the one the file states on that date, not the register’s current one.
Key facts
Storage Under construction (source status: (TS) Construction complete, but not yet in commercial operation) (what this status means)- Capacity
- Capacity: sourceLBNL "Queued Up" project-level interconnection queue data file (non-ISO regions) · Open license, with creditMW
- Queue position
- R1041
- In-service date
- (stated)
- Location
- Wayne County, Michigan
Details
Who’s behind it
- Developer
- DTE Electric Company · part of DTE Energy COOwnership claimOwnership link recorded from the companies' own published statements; no date stated by the source.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage source: “Other+Battery”
- Capacity (MW)
- 220 Capacity is the interconnection request in LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions). The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 220 MW nameplate.
- EIA plant
- 67759 generator TCHEC
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as under construction in EIA-860M (source status: “(TS) Construction complete, but not yet in commercial operation”).
- EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-12-01 → 2027-01-01.
- EIA-860M Preliminary Monthly Electric Generator Inventory: Status raw (V) Under construction, more than 50 percent complete → (TS) Construction complete, but not yet in commercial operation.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesSources Berkeley Lab · EIA-860M
Sources
- Berkeley LabLawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
- EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Project Cannoli Data Center Filed | Large load | 14.5 mi |