Show on map
- Wind & solar
- Storage
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
- Other infrastructure
Buffalo: route and 45 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Buffalo
Petroleum product pipeline
Key facts
Petroleum product pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-NY, US-PA
- Operated by
- SunocoSourceEIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 287
- Units
- 2
All 5 attributes from EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 2 |
| Operator, as the source states it | SUNOCO |
| Mapped segments | 2 |
| Source release | 202001 |
| Pipeline name raw | Buffalo |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Sources
- EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)Source: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Pipelines (as of January 2020)
- EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Delaware Conrath Road Solar LLC Permitted | Solar | 1.6 km | 3 |
| AES Rt 5 Solar CSG Under construction | Solar | 2.0 km | 5 |
| Hatchery Solar Permitted | Solar | 2.4 km | 20 |
| Deiter-STEU Postponed | Solar | 3.2 km | 2.2 |
| Northumberland Solar Postponed | Storage | 3.4 km | 20 |
| Good Spring NGCC Facility Postponed | Gas, combined cycle | 4.0 km | 358 |
| SR 415 - NY Avoca I Under construction | Solar | 4.1 km | 3.3 |
| Avon CSG 2 LLC Under construction | Solar | 5.8 km | 4.1 |
| Alpaca Postponed | Gas, reciprocating engine | 6.0 km | 22 |
| SL Pembroke Under construction | Solar | 6.1 km | 4 |
| SL Pembroke 2 Under construction | Solar | 6.1 km | 5 |
| NYSolar06 Under construction | Solar | 6.1 km | 3.5 |
| Clear View Solar Filed | Solar | 6.9 km | 20 |
| Cottontail Solar 3 Postponed | Solar | 6.9 km | 20 |
| Horseshoe Solar Energy Filed | Solar | 7.6 km | 180 |
| KCE NY 10, LLC Announced | Storage | 8.1 km | 20 |
| Wheaton-STEU Postponed | Solar | 8.4 km | 5 |
| Liberty Keefer Mill Road Solar LLC Permitted | Solar | 9.7 km | 3 |
| Leatherleaf Under construction | Solar | 10.2 km | 5 |
| NY ELBA 7195 OAK ORCHARD RD - Genesee 1 Under construction | Solar | 11.3 km | 5 |
| Alabama Ledge Wind Farm LLC Postponed | Wind | 11.6 km | 79.8 |
| Excelsior Energy Center Under construction | Solar | 11.8 km | 280 |
| ESC Tioga County Power Postponed | Gas, combined cycle | 12.6 km | 892.5 |
| BAI-Boyles Run-Phase I Announced | Solar | 12.7 km | 15.9 |
| BAI-Boyles Run-Phase 2 Announced | Solar | 12.7 km | 15.9 |
| Muncy Creek Lime Bluff Road Solar Permitted | Solar | 14.2 km | 3 |
| WMPI Pty LLC Postponed | Coal | 14.2 km | 41 |
| Hecate Energy Cider Solar LLC Under construction | Solar | 14.7 km | 557 |
| Highbanks Solar Announced | Solar | 15.7 km | 20 |
| Maidencreek Biomass Plant Postponed | Biomass | 15.7 km | 5.2 |
| Ecogen Wind Postponed | Wind | 16.8 km | 272 |
| Bear Ridge Filed | Solar | 17.2 km | 93 |
| Watkins Glen Wind Energy Center Postponed | Wind | 18.7 km | 80 |
| Gibson-STEU Postponed | Solar | 18.8 km | 11.5 |
| Montour Tower Drive Solar LLC Permitted | Solar | 19.0 km | 3 |
| SL Brockport Under construction | Solar | 19.2 km | 4.3 |
| Pioneer Crossing Energy, LLC Postponed | Biomass | 19.3 km | 3.2 |
| Cottontail Solar 9 Postponed | Solar | 21.4 km | 20 |
| Mountain Holly Solar Postponed | Solar | 21.5 km | 20 |
| Goonies Solar Project Postponed | Solar | 22.7 km | 194 |
| Heritage Wind Announced | Wind | 23.1 km | 126 |
| SunEast Highview Solar Project Postponed | Solar | 23.5 km | 20 |
| Chidsey Hill Road Solar Under construction | Solar | 24.0 km | 3 |
| Holley Road Solar Postponed | Solar | 24.1 km | 20 |
| Modern Innovative Energy LLC Postponed | Biomass | 24.5 km | 6.4 |