Show on map
Buford — Power plant · Hydro · USCE-Mobile DistrictQUALITY INVESTMENT PROPERTIES SUWANEE, LLC — Large load · GA · 14.1 km awayADP DATA CENTER (DC1) — Large load · GA · 18.1 km awayFLEXENTIAL ATL 4 DATA CENTER — Large load · GA · 18.1 km awayAT & T DATA CENTER — Large load · GA · 18.5 km awayWESTSIDE PARKWAY OWNER LLC — Large load · GA · 20.1 km away
  • Clean firm
  • Loads
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Hydro

Key facts

Power plant · Hydroran 12% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2003
Net generation, 2025
142,644 MWh
Grid
115 kV to Georgia Power Co (SOCO)
Location
Forsyth County, Georgia
Operated by
USCE-Mobile DistrictSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
23 years since 2003
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000603784
Location id
L100000603746
Fuel burned (MMBtu), 2025486,701
Capacity factor, 20250.124
Net generation (MWh), 2025142,644
Balancing authority codeSOCO

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
86 MW
Generators retired
3
Capacity still in service
131.2 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Conventional Hydroelectric40 MWRetiredDecember 2003
2Conventional Hydroelectric40 MWRetiredDecember 2004
3Conventional Hydroelectric6 MWRetiredFebruary 2005

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
Georgia Power Co
Balancing authority
Southern Company Services, Inc. - Trans
NERC region
SERC
Transmission lines within 25 km (4)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 3 scheduled to retire, 6 MW · EIA-860M
  • Stated Unit 2 scheduled to retire, 40 MW · EIA-860M
  • Stated Unit 1 scheduled to retire, 40 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
QUALITY INVESTMENT PROPERTIES SUWANEE, LLC Built Large load 14.1 km
ADP DATA CENTER (DC1) Built Large load 18.1 km
FLEXENTIAL ATL 4 DATA CENTER Unknown Large load 18.1 km
AT & T DATA CENTER Built Large load 18.5 km
WESTSIDE PARKWAY OWNER LLC Built Large load 20.1 km