Buford
Power plant · Hydro
Key facts
Power plant · Hydroran 12% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2003
- Net generation, 2025
- 142,644 MWh
- Grid
- 115 kV to Georgia Power Co (SOCO)
- Location
- Forsyth County, Georgia
- Operated by
- USCE-Mobile DistrictSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Hydro source: “Conventional Hydroelectric”
- Age
- 23 years since 2003
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Fuel burned (MMBtu), 2025 | 486,701 |
| Capacity factor, 2025 | 0.124 |
| Net generation (MWh), 2025 | 142,644 |
| Balancing authority code | SOCO |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 86 MW
- Generators retired
- 3
- Capacity still in service
- 131.2 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 40 MW | Retired | December 2003 |
| 2 | Conventional Hydroelectric | 40 MW | Retired | December 2004 |
| 3 | Conventional Hydroelectric | 6 MW | Retired | February 2005 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 115 kV
- Transmission or distribution system owner
- Georgia Power Co
- Balancing authority
- Southern Company Services, Inc. - Trans
- NERC region
- SERC
Transmission lines within 25 km (4)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 3 scheduled to retire, 6 MW · EIA-860M
- Stated Unit 2 scheduled to retire, 40 MW · EIA-860M
- Stated Unit 1 scheduled to retire, 40 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| QUALITY INVESTMENT PROPERTIES SUWANEE, LLC Built | Large load | 14.1 km | |
| ADP DATA CENTER (DC1) Built | Large load | 18.1 km | |
| FLEXENTIAL ATL 4 DATA CENTER Unknown | Large load | 18.1 km | |
| AT & T DATA CENTER Built | Large load | 18.5 km | |
| WESTSIDE PARKWAY OWNER LLC Built | Large load | 20.1 km |