Millers Ferry — Power plant · Hydro · USCE-Mobile DistrictJ Woodruff — Power plant · Hydro · USCE-Mobile DistrictWalter F George — Power plant · Hydro · USCE-Mobile DistrictBuford — Power plant · Hydro · USCE-Mobile DistrictAllatoona — Power plant · Hydro · USCE-Mobile DistrictWest Point (GA) — Power plant · Hydro · USCE-Mobile DistrictJones Bluff — Power plant · Hydro · USCE-Mobile DistrictCarters — Power plant · Hydro · USCE-Mobile DistrictTHE KEEP 2 CAMPUS — Filed · Large load · GA · 8.2 km awayQUALITY INVESTMENT PROPERTIES SUWANEE, LLC — Built · Large load · GA · 14.1 km awayCrane Operating Zone - Amazon Data Center — Filed · Large load · GA · 15.0 km awayRosewall Pines Holdings LLC — Permitted · Large load · GA · 15.2 km awayADP DATA CENTER (DC1) — Built · Large load · GA · 18.1 km awayFLEXENTIAL ATL 4 DATA CENTER — Large load · GA · 18.1 km awayAT & T DATA CENTER — Built · Large load · GA · 18.5 km awayWESTSIDE PARKWAY OWNER LLC — Built · Large load · GA · 20.1 km awayE B Harris Electric Generating Plant — Postponed · Gas, combined cycle · AL · 1,230 MW · 20.7 km awayAL Solar C LLC — Postponed · Solar · AL · 80 MW · 22.1 km away
  • Clean firm
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

USCE-Mobile District

Follow this company

Public agency

Key facts

Public agency · 1,185.7 MW
Capacity held
1,185.7MW
Assets
8
States
AL, FL, GA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why

Gross output of plants with a stake

8 of 8 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 8 of 8 plants with a stake: US plants with an EIA monthly series.100% of the output is from 8 plants recorded as wholly owned.8 plants: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2001 to 2026
  • Hydro
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearHydroTotal (MWh)
2026 (part year)-40,543-40,543
20251,512,4531,512,453
20241,595,9521,595,952
20231,760,2181,760,218
20221,875,4501,875,450
20212,380,0572,380,057
20202,475,8882,475,888
20192,136,3972,136,397
20182,005,0192,005,019
20171,439,1611,439,161
20161,368,9701,368,970
20151,754,0851,754,085
20141,758,7561,758,756
20131,915,2861,915,286
20121,593,8041,593,804
20111,920,4141,920,414
20102,053,3942,053,394
20092,678,4612,678,461
20081,868,6311,868,631
20071,495,8021,495,802
20061,732,4681,732,468
20052,616,6802,616,680
20042,248,4972,248,497
20032,413,1232,413,123
20021,736,0051,736,005
20011,759,0721,759,072

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 9, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 8

Assets

8

Capacity

1,186 MW

MW by fuel
  1. Hydro: 1,186 MW, 8 assets

Operates 8 power plants

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Held by
Carters Hydro Operates 500 MW US-GA USCE-Mobile District
Walter F George Hydro Operates 168 MW US-GA USCE-Mobile District
Buford Hydro Operates 131.2 MW US-GA USCE-Mobile District
Millers Ferry Hydro Operates 101.1 MW US-AL USCE-Mobile District
Allatoona Hydro Operates 86.6 MW US-GA USCE-Mobile District
Jones Bluff Hydro Operates 82 MW US-AL USCE-Mobile District
West Point (GA) Hydro Operates 73.3 MW US-GA USCE-Mobile District
J Woodruff Hydro Operates 43.5 MW US-FL USCE-Mobile District

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 10

within 25 km

Projects

10

within 25 km

Nearest

8.2 km

THE KEEP 2 CAMPUS

All 10NearbyShowing all 10 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Filed THE KEEP 2 CAMPUS Large load — 8.2 km away nearest: Allatoona
Built QUALITY INVESTMENT PROPERTIES SUWANEE, LLC Large load — 14.1 km away nearest: Buford
Filed Crane Operating Zone - Amazon Data Center Large load — 15.0 km away nearest: West Point (GA)
Permitted Rosewall Pines Holdings LLC Large load — 15.2 km away nearest: West Point (GA)
Built ADP DATA CENTER (DC1) Large load — 18.1 km away nearest: Buford
Unknown FLEXENTIAL ATL 4 DATA CENTER Large load — 18.1 km away nearest: Buford
Built AT & T DATA CENTER Large load — 18.5 km away nearest: Buford
Built WESTSIDE PARKWAY OWNER LLC Large load — 20.1 km away nearest: Buford
Postponed E B Harris Electric Generating Plant Gas, combined cycle 1,230 MW 20.7 km away nearest: Jones Bluff
Postponed AL Solar C LLC Solar 80 MW 22.1 km away nearest: West Point (GA)

Sources EPA ICIS-Air · FAA OE/AAA · Georgia EPD · EPA ICIS-NPDES · EIA-860M

Sources

  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026
  • FAA OE/AAAOpen license · retrieved Nov 9, 2026
  • Georgia EPDOpen license, with credit · retrieved Nov 8, 2026Source: Georgia Environmental Protection Division, Air Protection Branch
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution