Buzzard Roost
Power plant · Hydro
Key facts
Power plant · Hydroran 29% of 2022 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1940
- Net generation, 2022
- 37,825 MWh
- Grid
- 100 kV to Duke Energy Carolinas, LLC (DUK)
- Location
- Greenwood County, South Carolina
- Operated by
- South Carolina Public Service Authority
Output
- Gas
- Oil
Details
Who’s behind it
- Owner
- Greenwood County
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Hydro source: “Conventional Hydroelectric”
- Age
- 86 years since 1940
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | DUK |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- December 2021
- Capacity retired
- 15 MW
- Generators retired
- 3
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| HC1 | Conventional Hydroelectric | 5 MW | Retired | December 2021 |
| HC2 | Conventional Hydroelectric | 5 MW | Retired | December 2021 |
| HC3 | Conventional Hydroelectric | 5 MW | Retired | December 2021 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 100 kV
- Transmission or distribution system owner
- Duke Energy Carolinas, LLC
- Balancing authority
- Duke Energy Carolinas
- NERC region
- SERC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| South Carolina Public Service Authority | Operator | EIA-860M | ||
| Greenwood County | Owner | 100.0% | Dec 31, 2025 | EIA-860 |
Timeline
- Stated Units HC1, HC2, HC3 scheduled to retire, 15 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Flip Solar Postponed | Solar | 2.1 km | 15.8 |
| Ten Governors Solar Postponed | Solar | 6.7 km | 28 |
| Hudson Place Solar Plant Filed | Solar | 20.8 km | 70.7 |
Sources EIA-860M