- Combustion
- Clean firm
- Retired
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Combustion
- Clean firm
- Retired
- Other companies nearby
2 assets
2 assets. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Greenwood County
Power plant owner
Key facts
Power plant owner · 212.6 MW- Capacity held
- 212.6MW
- Assets
- 2
- States
- SC
- Registered in
- United States
- Website
- co.greenwood.sc.us Source: Wikidata
- Wikipedia
- English article Source: Wikidata
- Parent
- No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why
Gross output of plants with a stake
1 of 2 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 2 plants with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Hydro
Yearly totals
| Year | Hydro | Total (MWh) |
|---|---|---|
| 2022 | 37,825 | 37,825 |
| 2021 | 36,394 | 36,394 |
| 2020 | 29,501 | 29,501 |
| 2019 | 42,286 | 42,286 |
| 2018 | 41,815 | 41,815 |
| 2017 | 20,981 | 20,981 |
| 2016 | 25,752 | 25,752 |
| 2015 | 34,070 | 34,070 |
| 2014 | 36,404 | 36,404 |
| 2013 | 50,734 | 50,734 |
| 2012 | 19,206 | 19,206 |
| 2011 | -792 | -792 |
| 2010 | -1,302 | -1,302 |
| 2009 | -1,348 | -1,348 |
| 2008 | 857 | 857 |
| 2007 | 13 | 13 |
| 2006 | 10,505 | 10,505 |
| 2005 | 47,580 | 47,580 |
| 2004 | 41,265 | 41,265 |
| 2003 | 56,192 | 56,192 |
| 2002 | 25,813 | 25,813 |
| 2001 | 30,495 | 30,495 |
Assets 2
Assets
2
Capacity
213 MW
- Gas, combustion turbine: 198 MW, 1 asset
- Hydro: 15.0 MW, 1 asset
Owns 2 power plants
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Share | Held by |
|---|---|---|---|---|---|---|
| Buzzard Roost GT | Gas, combustion turbine | Owns | 197.6 MW | US-SC | 100.0% | Greenwood County |
| Buzzard Roost | Hydro | Owns | 15 MW | US-SC | 100.0% | Greenwood County |
Sources EIA-860M
Sources 2
Registers
2
Reuse terms
- 2 Open license
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 3
within 15 miProjects
3
within 15 mi
Nearest
0.8 mi
Flip Solar
All 3NearbyShowing all 3 nearby projects.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Postponed | Flip Solar | Solar | 15.8 MW | 0.8 mi away | nearest: Buzzard Roost GT |
| Postponed | Ten Governors Solar | Solar | 28 MW | 4.1 mi away | nearest: Buzzard Roost |
| Filed | Hudson Place Solar Plant | Solar | 70.7 MW | 12.9 mi away | nearest: Buzzard Roost |
Sources EIA-860M