Show on map
BWC Wareham River — Power plant · Solar · BWC Wareham River, LLCSolar Carver 1 Hybrid — Under construction · Solar + storage · MA · 4 MW · 4.2 mi awaySolar Carver 3 Hybrid — Under construction · Solar + storage · MA · 2 MW · 5.6 mi awayBlueWave Capital-Mattapoisett (SREC II) — Postponed · Solar · MA · 4.5 MW · 9.4 mi awayCanal — Postponed · Gas, combustion turbine · MA · 330 MW · 9.5 mi awayLogging Swamp South — Permitted · Solar · MA · 5 MW · 9.6 mi awayLogging Swamp North — Permitted · Solar · MA · 5 MW · 9.7 mi awaySnipatuit Road Solar — Under construction · Solar + storage · MA · 8 MW · 9.8 mi awayCushman Road Solar — Filed · Solar + storage · MA · 6 MW · 10.0 mi awayFeatherbed Lane South Solar — Under construction · Solar + storage · MA · 2 MW · 10.6 mi awayBraley Hill North Solar — Under construction · Solar + storage · MA · 10 MW · 10.9 mi awayClems Way Solar — Permitted · Solar · MA · 5 MW · 10.9 mi awayRandall Lane Solar — Under construction · Solar + storage · MA · 10 MW · 11.4 mi awayMA Acushnet 540R Main St — Filed · Solar + storage · MA · 6 MW · 11.5 mi away
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

BWC Wareham River

Power plant · Solar

Key facts

Power plant · Solarran 20% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
1,745 MWh
Grid
23 kV to NSTAR Electric Company (ISNE)
Location
Plymouth County, Massachusetts
Operated by
BWC Wareham River, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2018 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
8 years since 2018
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814888
Location id
L100000812278
Eia plant ids
62370
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
22.80
Transmission owner
NSTAR Electric Company
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 20255,956
Capacity factor, 20250.199
Net generation (MWh), 20251,745
Balancing authority codeISNE

Solar array

Array area (acres)
4.2
AC capacity (MW)
1
DC capacity (MW)
1.4
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2018

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Solar Carver 1 Hybrid Under construction Solar + storage 4.2 mi 4
Solar Carver 3 Hybrid Under construction Solar + storage 5.6 mi 2
BlueWave Capital-Mattapoisett (SREC II) Postponed Solar 9.4 mi 4.5
Canal Postponed Gas, combustion turbine 9.5 mi 330
Logging Swamp South Permitted Solar 9.6 mi 5
Logging Swamp North Permitted Solar 9.7 mi 5
Snipatuit Road Solar Under construction Solar + storage 9.8 mi 8
Cushman Road Solar Filed Solar + storage 10.0 mi 6
Featherbed Lane South Solar Under construction Solar + storage 10.6 mi 2
Braley Hill North Solar Under construction Solar + storage 10.9 mi 10
Clems Way Solar Permitted Solar 10.9 mi 5
Randall Lane Solar Under construction Solar + storage 11.4 mi 10
MA Acushnet 540R Main St Filed Solar + storage 11.5 mi 6

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution