Show on map
Callisto I Energy Center — Power plant · Storage · Callisto I Energy CenterCallisto II Energy Center — Under construction · Storage · TX · 303.2 MW · 0.1 mi awayPamela Heights I Energy Center — Under construction · Storage · TX · 101.7 MW · 0.1 mi awayTexas Petrochemicals — Postponed · Gas, combined cycle · TX · 560 MW · 12.3 mi awayImperial Power Plant LLC — Postponed · Gas, reciprocating engine · TX · 12 MW · 12.8 mi away
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Callisto I Energy Center

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
-23,521 MWh
Grid
138 kV to CenterPoint Energy (ERCO)
Location
Harris County, Texas
Operated by
Callisto I Energy CenterSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
2 years since 2024
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-23,521
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -23521.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Callisto II Energy Center Under construction Storage 0.1 mi 303.2
Pamela Heights I Energy Center Under construction Storage 0.1 mi 101.7
Texas Petrochemicals Postponed Gas, combined cycle 12.3 mi 560
Imperial Power Plant LLC Postponed Gas, reciprocating engine 12.8 mi 12

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution