Show on map
- Combustion
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
CalTech - Pasadena (PPA): location and 9 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
CalTech - Pasadena (PPA)
Power plant · Gas, other
Key facts
Power plant · Gas, otherran 79% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2016
- Net generation, 2025
- 6,961 MWh
- Grid
- 42 kV to City of Pasadena - (CA) (CISO)
- Location
- Los Angeles County, California
- Operated by
- Bloom Energy 2009 PPASourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, other source: “Other Natural Gas”
- Age
- 10 years since 2016
- Heat rate
- 7,458 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 51,914 |
| Capacity factor, 2025 | 0.795 |
| Heat rate (Btu/kWh), 2025 | 7,457.8 |
| Net generation (MWh), 2025 | 6,961 |
| Balancing authority code | CISO |
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| California Institute of Technology Postponed | Gas, combined cycle | 0.4 km | 16.5 |
| Glenarm BESS Plant Filed | Storage | 2.8 km | 25 |
| Scholl Canyon Under construction | Biomass | 6.8 km | 12 |
| Gabriel Under construction | Storage | 14.3 km | 400 |
| CPA 3777 Workman Postponed | Solar | 15.2 km | 1.9 |
| Bandini - SLLAX710 Under construction | Solar | 17.4 km | 1.3 |
| LATTC South Campus Solar Postponed | Solar | 18.1 km | 1.1 |
| PRIME DATA CENTER VERNON Built | Large load | 18.4 km | |
| Marici Under construction | Storage | 21.8 km | 400 |