Show on map
- Wind & solar
- Storage
- In development
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
- Operating
Cascade Solar (TX): location and 6 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Cascade Solar (TX)
Power plant · Solar
Key facts
Power plant · Solarran 7% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2019
- Net generation, 2025
- 5,788 MWh
- Grid
- 12 kV to CenterPoint Energy (ERCO)
- Location
- Wharton County, Texas
- Operated by
- Headwater Energy, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 7 years since 2019
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 19,750 |
| Capacity factor, 2025 | 0.066 |
| Net generation (MWh), 2025 | 5,788 |
| Balancing authority code | ERCO |
Solar arrays
Solar arrays
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 54.1
- AC capacity (MW)
- 10
- DC capacity (MW)
- 14.2
- Mounting
- Single-axis tracking
- Site type
- Greenfield
- Began operating
- 2019
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| OCI SunRoper Contracted | Solar | 2.5 mi | 265.1 |
| Erin Contracted | Solar | 3.0 mi | 208.3 |
| GulfStar Power, LLC Under construction | Solar | 3.5 mi | 451.6 |
| Pledger Under construction | Storage | 6.8 mi | 9.5 |
| Wittig Solar Park Permitted | Solar | 9.4 mi | 106.9 |
| City Breeze Energy Storage Under construction | Storage | 13.8 mi | 143.1 |