Show on map
Central Utility Plant at White Oak — Power plant · Gas, combined cycle · GSA Metropolitan Service CenterGANNETT COMPANY — Built · Large load · MD · 1.5 mi awayPROSPERITY DRIVE DATA CENTER, LLC — Built · Large load · MD · 1.7 mi awayVERIZON FAIRLAND DATA CENTER — Built · Large load · MD · 2.5 mi awayADP OF WASHINGTON — Built · Large load · MD · 7.4 mi awayCHP Plant — Under construction · Gas, combustion turbine · DC · 5.7 MW · 8.5 mi awayGENERAL ELECTRIC, ROCKVILLE — Built · Large load · MD · 9.8 mi awayProject Shadow S&R Crane 1 (Annapolis Junction MD data centre) — Filed · Large load · MD · 11.6 mi awayMontgomery County Oaks LFGE Plant — Postponed · Biomass · MD · 5.6 MW · 12.9 mi awayAMAZON DATA SERVICES INC LTW060 — Built · Large load · MD · 13.7 mi awayNORTHROP GRUMMAN SYSTEMS CORPORATION — Built · Large load · VA · 14.5 mi awayGE INFORMATION SYSTEMS — Built · Large load · MD · 14.5 mi awayValo Park — Built · Large load · VA · 14.7 mi awayZAYO GROUP, LLC — Built · Large load · VA · 14.9 mi away
  • Combustion
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Central Utility Plant at White Oak

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 20% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2003
Net generation, 2025
93,668 MWh
Grid
14 kV to Potomac Electric Power Co (PJM)
Location
Montgomery County, Maryland

Output

Net generation MWh by year, 2012 to 2026
Fuel burned MMBtu by year, 2012 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
23 years since 2003
Unused energy
382 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
13,491 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
13.80
Transmission owner
Potomac Electric Power Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071160641
Subparts reported
C
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1006938
Eia status
By code
OP
Mw
52
Units
11
SB
Mw
2.30
Units
1
Standby mw
2.30
Status rule
some_units_idle
In service mw
54.30
Out of service mw
0
Fuel burned (MMBtu), 20251,263,684
Capacity factor, 20250.197
Heat rate (Btu/kWh), 202513,491.2
Net generation (MWh), 202593,667.6
Balancing authority codePJM

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleAs ofSource
GSA Metropolitan Service Center Operator EIA-860M
U.S. Government Owner Dec 31, 2023 EPA GHGRP

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
GANNETT COMPANY Built Large load 1.5 mi
PROSPERITY DRIVE DATA CENTER, LLC Built Large load 1.7 mi
VERIZON FAIRLAND DATA CENTER Built Large load 2.5 mi
ADP OF WASHINGTON Built Large load 7.4 mi
CHP Plant Under construction Gas, combustion turbine 8.5 mi 5.7
GENERAL ELECTRIC, ROCKVILLE Built Large load 9.8 mi
Project Shadow S&R Crane 1 (Annapolis Junction MD data centre) Filed Large load 11.6 mi
Montgomery County Oaks LFGE Plant Postponed Biomass 12.9 mi 5.6
AMAZON DATA SERVICES INC LTW060 Built Large load 13.7 mi
NORTHROP GRUMMAN SYSTEMS CORPORATION Built Large load 14.5 mi
GE INFORMATION SYSTEMS Built Large load 14.5 mi
Valo Park Built Large load 14.7 mi
ZAYO GROUP, LLC Built Large load 14.9 mi

Sources EPA ICIS-Air · EIA-860M · FAA OE/AAA · Virginia DEQ

Sources

  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 13, 2026
  • Virginia DEQOpen license · retrieved Nov 4, 2026Source: Virginia Department of Environmental Quality

Attribution