Central Utility Plant at White Oak — Power plant · Gas, combined cycle · GSA Metropolitan Service Center
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Central Utility Plant at White Oak

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 20% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2003
Net generation, 2025
93,668 MWh
Grid
14 kV to Potomac Electric Power Co (PJM)
Location
Montgomery County, Maryland

Operations

Net generation, 2025
93,668MWh
Fuel burned, 2025
1,263,684MMBtu
Capacity factor, 2025
19.7%
Heat rate, 2025
13,491Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
2026 (8 of 12 months)63,919950,590—14,872
202593,6681,263,68419.7%13,491
2024 (9 of 12 months)74,045970,280—13,104
202397,0391,281,70720.4%13,208
202299,8141,339,87121.0%13,424
2021102,1801,377,88921.5%13,485
2020 (11 of 12 months)93,1761,290,845—13,854
2019105,0681,377,15722.1%13,107
2018106,0541,442,34222.3%13,600
2017105,9381,444,30622.3%13,634
2016102,1521,316,33721.4%12,886
2015161,3202,006,69433.9%12,439
201486,1411,160,29418.1%13,470
201374,896838,47415.8%11,195
201275,221791,86415.8%10,527
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)