79 assets · 1 project
79 assets · 1 project. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Not on this map: 143 projects: placed by county or state, a license that withholds the site, or a stage the map draws no dot for (withdrawn, cancelled, frozen or not stated). Each is in its tab below.
PacifiCorp
Utility
Key facts
Utility · 19,409.7 MW- Capacity held
- 19,409.7MW
- Assets
- 79
- Projects
- 144
- States
- AZ, CA, CO, ID, MT, OR and more
- Headquarters
- Portland, United States Source: Wikidata
- Website
- pacificorp.com Source: Wikidata
- LEI
- SGY07Y7FNYBNLM6Z1M11 Source: Wikidata
- Wikipedia
- English article Source: Wikidata
- Parent
- Berkshire Hathaway Energy CompanyOwnership claimOwnership link recorded from the companies' own published statements; no date stated by the source.
Gross output of plants with a stake
68 of 68 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 68 of 68 plants with a stake: US plants with an EIA monthly series.19% of the output is from 61 plants recorded as wholly owned.60 plants: operator, wholly owned per EIA-860.Not included: 11 plants it operates without a recorded stake.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Gas
- Coal
- Hydro
- Geothermal
- Wind
- Solar
Yearly totals
| Year | Gas | Coal | Hydro | Geothermal | Wind | Solar | Total (MWh) |
|---|---|---|---|---|---|---|---|
| 2026 (part year) | 6,755,952 | 12,745,972 | 323,807 | — | 3,135,828 | — | 22,961,559 |
| 2025 | 10,594,665 | 24,543,594 | 2,569,829 | 271,209 | 7,585,206 | 3,336 | 45,567,839 |
| 2024 | 11,152,449 | 23,000,452 | 2,586,743 | 272,457 | 6,539,564 | 3,873 | 43,555,538 |
| 2023 | 11,309,615 | 25,130,561 | 2,995,116 | 248,201 | 6,499,381 | 3,813 | 46,186,687 |
| 2022 | 13,134,073 | 32,620,855 | 2,937,224 | 262,129 | 7,235,946 | 3,934 | 56,194,161 |
| 2021 | 13,165,847 | 32,659,343 | 2,791,987 | 211,226 | 6,115,291 | 3,232 | 54,946,926 |
| 2020 | 12,802,501 | 29,814,980 | 3,035,907 | 175,570 | 3,856,676 | 3,553 | 49,689,187 |
| 2019 | 14,117,619 | 37,218,337 | 2,831,946 | 115,179 | 2,328,104 | 3,289 | 56,614,474 |
| 2018 | 13,460,374 | 36,484,059 | 3,257,560 | 223,051 | 3,136,216 | 4,113 | 56,565,373 |
| 2017 | 13,410,918 | 38,655,718 | 4,721,821 | 249,033 | 2,781,336 | 3,966 | 59,822,792 |
| 2016 | 13,642,032 | 36,745,296 | 3,842,190 | 256,918 | 3,161,759 | 4,021 | 57,652,216 |
| 2015 | 15,826,584 | 43,458,979 | 2,903,581 | 259,703 | 2,721,351 | 4,469 | 65,174,667 |
| 2014 | 16,330,936 | 44,519,667 | 3,773,072 | 274,996 | 3,131,349 | 4,307 | 68,034,327 |
| 2013 | 17,392,577 | 42,777,385 | 3,154,383 | 250,722 | 3,207,535 | 4,699 | 66,787,301 |
| 2012 | 15,911,079 | 42,529,698 | 4,241,441 | 268,542 | 3,121,966 | 585 | 66,073,311 |
| 2011 | 15,081,088 | 42,779,268 | 4,538,259 | 278,080 | 3,395,799 | — | 66,072,494 |
| 2010 | 18,022,692 | 47,950,024 | 3,717,910 | 274,358 | 2,644,896 | — | 72,609,880 |
| 2009 | 18,286,331 | 45,198,116 | 3,507,182 | 279,121 | 2,193,083 | — | 69,463,833 |
| 2008 | 18,917,257 | 49,976,817 | 3,740,286 | 254,277 | 1,299,735 | — | 74,188,372 |
| 2007 | 18,537,283 | 50,108,338 | 3,714,728 | 163,925 | 699,620 | — | 73,223,894 |
| 2006 | 18,123,174 | 48,070,465 | 4,563,599 | 190,608 | 331,094 | — | 71,278,940 |
| 2005 | 18,325,107 | 50,006,471 | 3,222,710 | 184,802 | 263,836 | — | 72,002,926 |
| 2004 | 18,457,446 | 32,886,474 | 3,397,524 | 194,876 | 132,049 | — | 55,068,369 |
| 2003 | 17,022,323 | 47,236,436 | 3,738,249 | 198,465 | 196,000 | — | 68,391,473 |
| 2002 | 17,857,249 | 45,744,069 | 3,542,950 | 184,447 | 276,034 | — | 67,604,749 |
| 2001 | 19,193,145 | 46,712,278 | 2,991,232 | 152,742 | 275,160 | — | 69,324,557 |
Sources EIA-860 · EIA-860M · EIA · EPA GHGRP
Sources
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Projects 144
Capacity
28.3 GW
<0.01 GW active
65 possible duplicatesPossible duplicatesThese queue requests name no project and may be a plant already listed, so they are not counted.
1–100 of 144 · All 144 in the projects list
Assets 79
Assets
79
Capacity
19,410 MW
- Coal: 9,232 MW, 10 assets
- Wind: 3,166 MW, 19 assets
- Gas, combined cycle: 3,028 MW, 4 assets
- Gas, steam turbine: 2,759 MW, 2 assets
- Hydro: 1,170 MW, 41 assets
- Other: 56.1 MW, 3 assets
Operates 74 power plants · Owns 8 power plants
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Share | Held by |
|---|---|---|---|---|---|---|
| Jim Bridger | Gas, steam turbine | Operates and owns | 2,326 MW | US-WY | 66.7% | PacifiCorp |
| Colstrip | Coal | Owns | 1,647.4 MW | US-MT | 10.0% | PacifiCorp |
| Hunter | Coal | Operates and owns | 1,472.2 MW | US-UT | 51.1% | PacifiCorp |
| Craig (CO) | Coal | Owns | 1,427.6 MW | US-CO | 12.1% | PacifiCorp |
| Lake Side Power Plant | Gas, combined cycle | Operates | 1,246.5 MW | US-UT | — | PacifiCorp |
| Cholla | Coal | Owns | 1,128.8 MW | US-AZ | 100.0% | PacifiCorp |
| Huntington | Coal | Operates | 1,015.5 MW | US-UT | — | PacifiCorp |
| Dave Johnston | Coal | Operates | 816.7 MW | US-WY | — | PacifiCorp |
| Naughton | Coal | Operates | 707.2 MW | US-WY | — | PacifiCorp |
| Hermiston Generating Plant | Gas, combined cycle | Owns | 621.2 MW | US-OR | 50.0% | PacifiCorp |
| Chehalis Generating Facility | Gas, combined cycle | Operates | 593.3 MW | US-WA | — | PacifiCorp |
| Rock Creek Wind | Wind | Operates | 590 MW | US-WY | — | PacifiCorp |
| Currant Creek | Gas, combined cycle | Operates | 566.9 MW | US-UT | — | PacifiCorp |
| TB Flats | Wind | Operates | 503.2 MW | US-WY | — | PacifiCorp |
| Hayden | Coal | Owns | 465.4 MW | US-CO | 17.5% | PacifiCorp |
| Gadsby | Gas, steam turbine | Operates | 432.8 MW | US-UT | — | PacifiCorp |
| Wyodak | Coal | Operates and owns | 362.1 MW | US-WY | 80.0% | PacifiCorp |
| Ekola Flats | Wind | Operates | 250.9 MW | US-WY | — | PacifiCorp |
| Swift 1 | Hydro | Operates | 240 MW | US-WA | — | PacifiCorp |
| Pryor Mountain Wind | Wind | Operates | 239.8 MW | US-MT | — | PacifiCorp |
| Marengo Wind Plant | Wind | Operates | 234 MW | US-WA | — | PacifiCorp |
| Cedar Springs II | Wind | Operates | 200 MW | US-WY | — | PacifiCorp |
| Carbon | Coal | Operates | 188.6 MW | US-UT | — | PacifiCorp |
| Glenrock | Wind | Operates | 165.6 MW | US-WY | — | PacifiCorp |
| Seven Mile Hill | Wind | Operates | 146.2 MW | US-WY | — | PacifiCorp |
| Merwin | Hydro | Operates | 136 MW | US-WA | — | PacifiCorp |
| Foote Creek Rim | Wind | Operates | 134.8 MW | US-WY | — | PacifiCorp |
| Yale | Hydro | Operates | 134 MW | US-WA | — | PacifiCorp |
| Dunlap | Wind | Operates | 129.5 MW | US-WY | — | PacifiCorp |
| High Plains | Wind | Operates | 122.1 MW | US-WY | — | PacifiCorp |
| Rolling Hills | Wind | Operates | 115.8 MW | US-WY | — | PacifiCorp |
| Leaning Juniper | Wind | Operates | 110.4 MW | US-OR | — | PacifiCorp |
| Goodnoe Hills | Wind | Operates | 103.4 MW | US-WA | — | PacifiCorp |
| John C Boyle | Hydro | Operates | 98.7 MW | US-OR | — | PacifiCorp |
| Swift 2 | Hydro | Operates | 72 MW | US-WA | — | PacifiCorp |
| Lemolo 2 | Hydro | Operates | 43.7 MW | US-OR | — | PacifiCorp |
| Toketee Falls | Hydro | Operates | 42.6 MW | US-OR | — | PacifiCorp |
| Foote Creek I | Wind | Operates | 41.4 MW | US-WY | — | PacifiCorp |
| Blundell | Geothermal | Operates | 38.1 MW | US-UT | — | PacifiCorp |
| McFadden Ridge | Wind | Operates | 35.2 MW | US-WY | — | PacifiCorp |
| Grace | Hydro | Operates | 33 MW | US-ID | — | PacifiCorp |
| Lemolo 1 | Hydro | Operates | 32 MW | US-OR | — | PacifiCorp |
| Prospect 2 | Hydro | Operates | 32 MW | US-OR | — | PacifiCorp |
| Oneida | Hydro | Operates | 30 MW | US-ID | — | PacifiCorp |
| Cutler Hydro | Hydro | Operates | 30 MW | US-UT | — | PacifiCorp |
| Copco 2 | Hydro | Operates | 27 MW | US-CA | — | PacifiCorp |
| Clearwater 2 | Hydro | Operates | 26 MW | US-OR | — | PacifiCorp |
| Foote Creek III | Wind | Operates | 24.8 MW | US-WY | — | PacifiCorp |
| Copco 1 | Hydro | Operates | 20 MW | US-CA | — | PacifiCorp |
| Slide Creek | Hydro | Operates | 18 MW | US-OR | — | PacifiCorp |
| Iron Gate | Hydro | Operates | 18 MW | US-CA | — | PacifiCorp |
| Foote Creek IV | Wind | Operates | 16.8 MW | US-WY | — | PacifiCorp |
| Little Mountain | Gas, combustion turbine | Operates | 16 MW | US-UT | — | PacifiCorp |
| Clearwater 1 | Hydro | Operates | 15 MW | US-OR | — | PacifiCorp |
| Soda | Hydro | Operates | 14.6 MW | US-ID | — | PacifiCorp |
| Condit | Hydro | Operates | 13.7 MW | US-WA | — | PacifiCorp |
| Soda Springs | Hydro | Operates | 11 MW | US-OR | — | PacifiCorp |
| Fish Creek | Hydro | Operates | 11 MW | US-OR | — | PacifiCorp |
| Olmstead | Hydro | Operates | 10.3 MW | US-UT | — | PacifiCorp |
| Cove | Hydro | Operates | 7.5 MW | US-ID | — | PacifiCorp |
| Prospect 3 | Hydro | Operates | 7.2 MW | US-OR | — | PacifiCorp |
| Ashton | Hydro | Operates | 6.7 MW | US-ID | — | PacifiCorp |
| Powerdale | Hydro | Operates | 6 MW | US-OR | — | PacifiCorp |
| Pioneer | Hydro | Operates | 5 MW | US-UT | — | PacifiCorp |
| Big Fork | Hydro | Operates | 4.1 MW | US-MT | — | PacifiCorp |
| Prospect 1 | Hydro | Operates | 3.8 MW | US-OR | — | PacifiCorp |
| Weber | Hydro | Operates | 3.8 MW | US-UT | — | PacifiCorp |
| East Side | Hydro | Operates | 3.2 MW | US-OR | — | PacifiCorp |
| Eagle Point | Hydro | Operates | 2.8 MW | US-OR | — | PacifiCorp |
| Fall Creek | Hydro | Operates | 2.1 MW | US-CA | — | PacifiCorp |
| Granite | Hydro | Operates | 2 MW | US-UT | — | PacifiCorp |
| Black Cap Solar Plant | Solar | Operates | 2 MW | US-OR | — | PacifiCorp |
| Foote Creek II | Wind | Operates | 1.8 MW | US-WY | — | PacifiCorp |
| Last Chance | Hydro | Operates | 1.7 MW | US-ID | — | PacifiCorp |
| Wallowa Falls | Hydro | Operates | 1.1 MW | US-OR | — | PacifiCorp |
| Bend | Hydro | Operates | 1.1 MW | US-OR | — | PacifiCorp |
| Prospect 4 | Hydro | Operates | 1 MW | US-OR | — | PacifiCorp |
| Stairs | Hydro | Operates | 1 MW | US-UT | — | PacifiCorp |
| Cline Falls | Hydro | Operates | 1 MW | US-OR | — | PacifiCorp |
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Ownership 1
Companies
1
Parents
1
Subsidiaries
0
direct
-
Berkshire Hathaway Energy Company Ultimate parent 128 assets36,045.3 MWwith the companies below
-
PacifiCorp This company · share not stated 62 assets17,717.3 MW
-
MidAmerican Energy Co Subsidiary · share not stated 59 assets15,942.2 MW
-
Sierra Pacific Power Co Subsidiary · share not stated 6 assets2,255.8 MW
-
The same companies as a table, with each ownership claim
| Company. Sort by company, A to Z | Relationship, sorted ascending. Sort by relationship, subsidiaries first | Assets. Sort by assets held, largest first | Asset types |
|---|---|---|---|
| Berkshire Hathaway Energy CompanyOwnership link recorded from the companies' own published statements; no date stated by the source. | Parent | — | — |
Sources 4
Registers
4
Reuse terms
- 2 Open license
- 2 Open license, with credit
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
-
View at source →
Berkeley Lab ·
LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)
Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker. · license
Publication page https://eta-publications.lbl.gov/publications/queued-2026-edition-characteristics, retrieved 2026-10-23 (HTTP 200) — "Copyright Notice: The Queued Up data file is licensed CC BY 4.0. You may use, share, or adapt the dataset as long as you attribute it to Lawrence Berkeley National Laboratory and GridTracker." and "Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker. CC BY 4.0. All rights reserved." The file's Introduction sheet adds the DOE contract notice ("This dataset has been authored by an author at Lawrence Berkeley National Laboratory under Contract No. DE-AC02-05CH11231 with the U.S. Department of Energy ...") and the standard no-warranty disclaimer
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 56
within 25 kmProjects
56
within 25 km
Nearest
0.0 km
Blundell
All 56NearbyShowing all 56 nearby projects. The 50 nearest fill 49 rows, as a project's generator units share a row.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Postponed | Blundell | Geothermal | 30 MW | 0.0 km away | nearest: Blundell |
| Postponed | Perennial Wind Chaser Station | Gas, combustion turbine | 424 MW | 0.3 km away | nearest: Hermiston Generating Plant |
| Postponed | Klamath Solar | Solar | 5 MW | 1.1 km away | nearest: East Side |
| Permitted | Morel Energy Storage | Storage | 200 MW | 1.2 km away | nearest: Craig (CO) |
| Postponed | Medicine Bow Fuel & Power LLC | Coal | 350 MW | 2.8 km away | nearest: Dunlap |
| Built | DATA CENTER (200 S 200 E SLC) | Large load | — | 3.7 km away | nearest: Gadsby |
| Under construction | OIT BESS | Storage | 2 MW | 3.9 km away | nearest: East Side |
| Postponed | Blue Marmot V | Solar | 10 MW | 4.1 km away | nearest: Black Cap Solar Plant |
| Postponed | Hornshadow Solar, LLC | Storage | 25 MW | 4.5 km away | nearest: Hunter |
| Postponed | Hornshadow Solar II, LLC | Storage | 50 MW | 4.5 km away | nearest: Hunter |
| Postponed | Simpson Ridge Wind Farm LLC | Wind | 50 MW | 4.6 km away | nearest: Seven Mile Hill |
| Filed | Dutchman Solar generation and BESS | Solar + storage | 998 MW | 5.0 km away | nearest: Dave Johnston |
| Postponed | Klamath | Gas, combined cycle | 583.9 MW | 5.8 km away | nearest: East Side |
| Under construction | Cape Generating Station × 2 units | Geothermal | 129 MW | 5.9 km away | nearest: Blundell |
| Postponed | Mud Springs Wind Project, LLC | Wind | 80 MW | 6.1 km away | nearest: Pryor Mountain Wind |
| Filed | Data Center 3 | Large load | — | 6.5 km away | nearest: Currant Creek |
| Contracted | Kemmerer Unit 1 | Nuclear | 500 MW | 6.6 km away | nearest: Naughton |
| Postponed | Blue Marmot VII | Solar | 10 MW | 6.9 km away | nearest: Black Cap Solar Plant |
| Postponed | Horse Thief Wind Project, LLC | Wind | 80 MW | 7.6 km away | nearest: Pryor Mountain Wind |
| Filed | Data Center 1 | Large load | — | 7.7 km away | nearest: Currant Creek |
| Filed | Two Rivers Wind Facility | Wind | 6.1 MW | 7.8 km away | nearest: Dunlap |
| Filed | PDX 245 Campus-Water Tank/Auxiliary Buidling | Large load | — | 7.9 km away | nearest: Hermiston Generating Plant |
| Built | AMAZON DATA SERVICES, INC. | Large load | — | 8.0 km away | nearest: Hermiston Generating Plant |
| Under construction | GRANITE FORTRESS LLC - JUAB DATA CENTER | Large load | — | 8.8 km away | nearest: Currant Creek |
| Postponed | Blue Marmot IX | Solar | 10 MW | 10.7 km away | nearest: Black Cap Solar Plant |
| Unknown | CONDUENT DATA CENTER | Large load | — | 10.9 km away | nearest: Granite |
| Under construction | Oregon Trail Solar | Solar | 41 MW | 11.2 km away | nearest: Leaning Juniper |
| Built | ALIGNED DATA CENTER SLC-4 | Large load | — | 11.3 km away | nearest: Gadsby |
| Postponed | Blue Marmot VI | Solar | 10 MW | 12.6 km away | nearest: Black Cap Solar Plant |
| Under construction | Shutler Energy Storage | Storage | 41 MW | 12.7 km away | nearest: Leaning Juniper |
| Under construction | Rodatherm Milford 1 | Geothermal | 1.8 MW | 14.4 km away | nearest: Blundell |
| Postponed | Medicine Bow | Wind | 1.4 MW | 14.4 km away | nearest: Ekola Flats |
| Under construction | Milford Solar Phase II | Solar | 310 MW | 14.5 km away | nearest: Blundell |
| Filed | Lower Snake Solar Generation BESS | Solar + storage | 600 MW | 14.7 km away | nearest: Marengo Wind Plant |
| Under construction | SABEY UMATILLA DATA CENTER | Large load | — | 15.6 km away | nearest: Hermiston Generating Plant |
| Postponed | Blue Marmot VIII | Solar | 10 MW | 16.1 km away | nearest: Black Cap Solar Plant |
| Postponed | Roosevelt Biogas 1 | Biomass | 2.1 MW | 16.9 km away | nearest: Leaning Juniper |
| Postponed | Milford Wind Corridor Phase III | Wind | 100 MW | 17.1 km away | nearest: Blundell |
| Filed | Snowflake A Solar and BESS | Solar + storage | 950 MW | 17.5 km away | nearest: Cholla |
| Postponed | Lund Hill | Wind | 60 MW | 17.5 km away | nearest: Goodnoe Hills |
| Postponed | Kennecott Power Plant | Gas, combined cycle | 214.3 MW | 17.5 km away | nearest: Gadsby |
| Filed | Centralia Battery Energy Storage System | Storage | 200 MW | 17.6 km away | nearest: Chehalis Generating Facility |
| Postponed | Tono Solar | Solar | 80 MW | 18.0 km away | nearest: Chehalis Generating Facility |
| Built | UTAH DATA CENTER | Large load | — | 18.7 km away | nearest: Lake Side Power Plant |
| Postponed | Joes Valley Dam | Hydro | 3.4 MW | 19.1 km away | nearest: Huntington |
| Postponed | Boswell Wind II | Wind | 80 MW | 20.8 km away | nearest: McFadden Ridge |
| Filed | Biglow Solar Generation and BESS | Solar + storage | 250 MW | 21.1 km away | nearest: Goodnoe Hills |
| Permitted | Bluebird Solar | Solar | 140 MW | 21.2 km away | nearest: Goodnoe Hills |
| Filed | Project Sequoia- Data Center | Large load | — | 22.0 km away | nearest: Granite |
Sources EIA-860M · EPA ICIS-NPDES · FAA OE/AAA · Berkeley Lab · EPA ICIS-Air
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)
- LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)