Show on map
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
CHEVRON USA INC MONTEBELLO, MONTEBELLO CA: location and 14 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Chevron USA Inc Montebello, Montebello CA
Petroleum product terminal
As filed: CHEVRON USA INC MONTEBELLO, MONTEBELLO CA
Key facts
Petroleum product terminal Operating- Location
- California
Details
Who’s behind it
- Owner
- Chevron USA Inc MontebelloSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
Capacity not stated
All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
| Attribute | Value |
|---|---|
| Padd | 5 |
| Site | MONTEBELLO CA |
| Survey | EIA-815 |
| Owner, as the source states it | CHEVRON USA INC MONTEBELLO |
| Source release | 202109 |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Terminals (as of September 2021)
- EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Bandini - SLLAX710 Under construction | Solar | 1.7 mi | 1.3 |
| CPA 3777 Workman Postponed | Solar | 4.8 mi | 1.9 |
| PRIME DATA CENTER VERNON Built | Large load | 6.2 mi | |
| Glenarm BESS Plant Filed | Storage | 8.5 mi | 25 |
| LATTC South Campus Solar Postponed | Solar | 8.7 mi | 1.1 |
| California Institute of Technology Postponed | Gas, combined cycle | 9.1 mi | 16.5 |
| Marici Under construction | Storage | 10.1 mi | 400 |
| Scholl Canyon Under construction | Biomass | 11.1 mi | 12 |
| Gabriel Under construction | Storage | 11.3 mi | 400 |
| South Bay Dis Ctr 6-SLLAX680 Under construction | Solar | 12.6 mi | 1.3 |
| Fordyce - SLLAX680 Under construction | Solar | 12.6 mi | 1.3 |
| South Bay Dis Ctr 12 - SLLAX104 Under construction | Solar | 12.7 mi | 1.2 |
| Dominguez - SLLAX512 Under construction | Solar | 13.0 mi | 1.3 |
| Watson Cogeneration Withdrawn | Gas, combined cycle | 14.9 mi | 94.2 |
Sources EIA-860M · EPA ICIS-NPDES · CAISO