Show on map
CHEVRON USA INC MONTEBELLO, MONTEBELLO CA — Petroleum product terminalBandini - SLLAX710 — Under construction · Solar · CA · 1.3 MW · 1.7 mi awayCPA 3777 Workman — Postponed · Solar · CA · 1.9 MW · 4.8 mi awayPRIME DATA CENTER VERNON — Built · Large load · CA · 6.2 mi awayGlenarm BESS Plant — Filed · Storage · CA · 25 MW · 8.5 mi awayLATTC South Campus Solar — Postponed · Solar · CA · 1.1 MW · 8.7 mi awayCalifornia Institute of Technology — Postponed · Gas, combined cycle · CA · 16.5 MW · 9.1 mi awayMarici — Under construction · Storage · CA · 400 MW · 10.1 mi awayScholl Canyon — Under construction · Biomass · CA · 12 MW · 11.1 mi awayGabriel — Under construction · Storage · CA · 400 MW · 11.3 mi awaySouth Bay Dis Ctr 6-SLLAX680 — Under construction · Solar · CA · 1.3 MW · 12.6 mi awayFordyce - SLLAX680 — Under construction · Solar · CA · 1.3 MW · 12.6 mi awaySouth Bay Dis Ctr 12 - SLLAX104 — Under construction · Solar · CA · 1.2 MW · 12.7 mi awayDominguez - SLLAX512 — Under construction · Solar · CA · 1.3 MW · 13.0 mi awayWatson Cogeneration — Withdrawn · Gas, combined cycle · CA · 94.2 MW · 14.9 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Chevron USA Inc Montebello, Montebello CA

Petroleum product terminal

As filed: CHEVRON USA INC MONTEBELLO, MONTEBELLO CA

Key facts

Petroleum product terminal Operating
Location
California

Details

Who’s behind it

Owner
Chevron USA Inc MontebelloSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Capacity not stated

All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Attributes
AttributeValue
Padd5
SiteMONTEBELLO CA
SurveyEIA-815
Owner, as the source states itCHEVRON USA INC MONTEBELLO
Source release202109

Sources

2 sources

Sources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Sources

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Bandini - SLLAX710 Under construction Solar 1.7 mi 1.3
CPA 3777 Workman Postponed Solar 4.8 mi 1.9
PRIME DATA CENTER VERNON Built Large load 6.2 mi
Glenarm BESS Plant Filed Storage 8.5 mi 25
LATTC South Campus Solar Postponed Solar 8.7 mi 1.1
California Institute of Technology Postponed Gas, combined cycle 9.1 mi 16.5
Marici Under construction Storage 10.1 mi 400
Scholl Canyon Under construction Biomass 11.1 mi 12
Gabriel Under construction Storage 11.3 mi 400
South Bay Dis Ctr 6-SLLAX680 Under construction Solar 12.6 mi 1.3
Fordyce - SLLAX680 Under construction Solar 12.6 mi 1.3
South Bay Dis Ctr 12 - SLLAX104 Under construction Solar 12.7 mi 1.2
Dominguez - SLLAX512 Under construction Solar 13.0 mi 1.3
Watson Cogeneration Withdrawn Gas, combined cycle 14.9 mi 94.2

Sources EIA-860M · EPA ICIS-NPDES · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • CAISOOpen license, with credit · retrieved Nov 19, 2026Source: California ISO

Attribution