Show on map
Chisum — Power plant · Solar · Headwater Energy, LLCSGT Hoskins Solar Project Hybrid — Solar + storage · TX · 306.2 MW · 4.9 km awayEchols Grove Solar — Solar · TX · 200.9 MW · 6.5 km awayPARIS DATA CENTER PROJECT — Large load · TX · 17.1 km awayMRG Goody Solar Project Hybrid — Solar + storage · TX · 223.1 MW · 22.1 km away
  • Wind & solar
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 16% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
13,818 MWh
Grid
22 kV to Texas-New Mexico Power Co (ERCO)
Location
Lamar County, Texas
Operated by
Headwater Energy, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2018 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
8 years since 2018
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000815096
Location id
L100000812466
Eia plant ids
61810
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
22
Transmission owner
Texas-New Mexico Power Co
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 202547,147
Capacity factor, 20250.158
Net generation (MWh), 202513,818
Balancing authority codeERCO

Solar arrays

Array area (acres)
74.1
AC capacity (MW)
10
DC capacity (MW)
14.2
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2018

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
SGT Hoskins Solar Project Hybrid Announced Solar + storage 4.9 km 306.2
Echols Grove Solar Contracted Solar 6.5 km 200.9
PARIS DATA CENTER PROJECT Built Large load 17.1 km
MRG Goody Solar Project Hybrid Built Solar + storage 22.1 km 223.1