Show on map
Church Road - Getwell 230 kV — Transmission line330T - Gun Range Datacenter — Filed · Large load · MS · 3.1 mi away5C MEM01 INC — Built · Large load · TN · 8.9 mi awayArkabutla Lake Hydroelectric Project — Announced · Hydro · MS · 5 MW · 9.6 mi awayCOLOSSUS DATA CENTER — Built · Large load · TN · 10.5 mi awayOPPIDAN DATA CENTER — Built · Large load · TN · 11.6 mi awayPenton Solar Plant — Announced · Solar · MS · 190 MW · 13.1 mi away
  • Clean firm
  • Wind & solar
  • Loads
  • In development
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Church Road - Getwell 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-MS
Owner (as stated)
Entergy Mississippi

Details

Who’s behind it

Owner
Entergy Mississippi

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
9
Substations at the ends (as the source names them)
Church Road to Getwell
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itentergy mississippi
HIFLD line ID116472
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
330T - Gun Range Datacenter Filed Large load 3.1 mi
5C MEM01 INC Built Large load 8.9 mi
Arkabutla Lake Hydroelectric Project Announced Hydro 9.6 mi 5
COLOSSUS DATA CENTER Built Large load 10.5 mi
OPPIDAN DATA CENTER Built Large load 11.6 mi
Penton Solar Plant Announced Solar 13.1 mi 190

Sources FAA OE/AAA · EPA ICIS-Air · EIA-860M · EPA ICIS-NPDES

Sources

Attribution