Show on map
Cliffside - Shelby Tie 230 kV — Transmission lineHigh Pockets Solar — Postponed · Solar · NC · 1.9 MW · 0.1 mi awayJames E. Rogers Energy Complex — Postponed · Coal · NC · 800 MW · 0.3 mi awayInnovative Solar 33 — Postponed · Solar · NC · 30.5 MW · 1.9 mi awayShadow Solar — Postponed · Solar · NC · 3 MW · 3.7 mi awayBradley Farm — Postponed · Solar · NC · 5 MW · 4.7 mi awayColin Solar — Postponed · Solar · NC · 4 MW · 6.0 mi awayShakespeare Solar — Postponed · Solar · NC · 5 MW · 7.8 mi awayBELLSOUTH TELECOMMUNICATIONS, LLC DBA AT&T NORTH CAROLINA — Built · Large load · NC · 9.0 mi awayCleveland Cnty Generating Facility — Postponed · Gas, combustion turbine · NC · 736 MW · 9.1 mi awayPeanut Solar — Postponed · Solar · NC · 5 MW · 9.4 mi awayHereford Holdings` — Postponed · Solar · NC · 5 MW · 12.4 mi awayHunters Cove Solar — Postponed · Solar · NC · 50 MW · 14.7 mi away
  • Loads
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Cliffside - Shelby Tie 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NC
Owner (as stated)
Duke Energy Carolinas

Details

Who’s behind it

Owner
Duke Energy Carolinas

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
14
Substations at the ends (as the source names them)
Cliffside to Shelby Tie
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy carolinas
HIFLD line ID100149
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
High Pockets Solar Postponed Solar 0.1 mi 1.9
James E. Rogers Energy Complex Postponed Coal 0.3 mi 800
Innovative Solar 33 Postponed Solar 1.9 mi 30.5
Shadow Solar Postponed Solar 3.7 mi 3
Bradley Farm Postponed Solar 4.7 mi 5
Colin Solar Postponed Solar 6.0 mi 4
Shakespeare Solar Postponed Solar 7.8 mi 5
BELLSOUTH TELECOMMUNICATIONS, LLC DBA AT&T NORTH CAROLINA Built Large load 9.0 mi
Cleveland Cnty Generating Facility Postponed Gas, combustion turbine 9.1 mi 736
Peanut Solar Postponed Solar 9.4 mi 5
Hereford Holdings` Postponed Solar 12.4 mi 5
Hunters Cove Solar Postponed Solar 14.7 mi 50

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution