Cliffside - Shelby Tie 230 kV: route and 12 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Cliffside - Shelby Tie 230 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-NC
- Owner (as stated)
- Duke Energy Carolinas
Details
Who’s behind it
- Owner
- Duke Energy Carolinas
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 14
- Substations at the ends (as the source names them)
- Cliffside to Shelby Tie
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | duke energy carolinas |
| HIFLD line ID | 100149 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| High Pockets Solar Postponed | Solar | 0.1 mi | 1.9 |
| James E. Rogers Energy Complex Postponed | Coal | 0.3 mi | 800 |
| Innovative Solar 33 Postponed | Solar | 1.9 mi | 30.5 |
| Shadow Solar Postponed | Solar | 3.7 mi | 3 |
| Bradley Farm Postponed | Solar | 4.7 mi | 5 |
| Colin Solar Postponed | Solar | 6.0 mi | 4 |
| Shakespeare Solar Postponed | Solar | 7.8 mi | 5 |
| BELLSOUTH TELECOMMUNICATIONS, LLC DBA AT&T NORTH CAROLINA Built | Large load | 9.0 mi | |
| Cleveland Cnty Generating Facility Postponed | Gas, combustion turbine | 9.1 mi | 736 |
| Peanut Solar Postponed | Solar | 9.4 mi | 5 |
| Hereford Holdings` Postponed | Solar | 12.4 mi | 5 |
| Hunters Cove Solar Postponed | Solar | 14.7 mi | 50 |
Sources EIA-860M · EPA ICIS-Air