Power plant · Oil

Key facts

Power plant · Oil Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1939
Net generation, 2019
-80 MWh
Location
Lenawee County, Michigan
Operated by
Village of Clinton - (MI)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2019
Fuel burned MMBtu by year, 2002 to 2019
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
87 years since 1939
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2019
First unit retired
August 2008
Capacity retired
4.2 MW
Generators retired
6
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Petroleum Liquids0.4 MWRetiredAugust 2008
4Petroleum Liquids0.4 MWRetiredAugust 2008
5Petroleum Liquids0.4 MWRetiredAugust 2008
1Petroleum Liquids0.5 MWRetiredDecember 2019
2Petroleum Liquids0.5 MWRetiredDecember 2019
6Petroleum Liquids2 MWRetiredDecember 2019

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
MISO
Transmission lines within 25 km (7)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2, 6 scheduled to retire, 3 MW · EIA-860M
  • Stated Units 3, 4, 5 scheduled to retire, 1.2 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
The Barn (Saline data centre) Filed Large load 8.7 km
Voyager Energy Storage Under construction Storage 15.1 km 100
Beecher Solar Park Under construction Solar 16.9 km 80