Colon PV: location and 12 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Colon PV
Power plant · Solar
Key facts
Power plant · Solarran 14% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2015
- Net generation, 2025
- 1,640 MWh
- Grid
- 34 kV to Los Angeles Department of Water & Power (LDWP)
- Location
- Los Angeles County, California
- Operated by
- Los Angeles Department of Water & Power
Output
Details
Who’s behind it
- Owner
- Colon FiT LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 11 years since 2015
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 5,597 |
| Capacity factor, 2025 | 0.144 |
| Net generation (MWh), 2025 | 1,640 |
| Balancing authority code | LDWP |
Solar array
Solar array
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 4.8
- AC capacity (MW)
- 1.3
- DC capacity (MW)
- 1.5
- Mounting
- Fixed tilt
- Site type
- Greenfield
- Began operating
- 2015
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Los Angeles Department of Water & Power | Operator | EIA-860M | ||
| Colon FiT LLC | Owner | 100.0% | Dec 31, 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Watson Cogeneration Withdrawn | Gas, combined cycle | 1.7 mi | 94.2 |
| Elevate Pier S Filed | Storage | 2.5 mi | 70 |
| Dominguez - SLLAX512 Under construction | Solar | 3.6 mi | 1.3 |
| South Bay Dis Ctr 12 - SLLAX104 Under construction | Solar | 3.8 mi | 1.2 |
| South Bay Dis Ctr 6-SLLAX680 Under construction | Solar | 3.9 mi | 1.3 |
| Fordyce - SLLAX680 Under construction | Solar | 3.9 mi | 1.3 |
| San Pedro Public Market (SPPM) Under construction | Solar | 4.5 mi | 1.2 |
| Torrance Dis Ctr 2 - SLLAX100 Under construction | Solar | 5.2 mi | 1.4 |
| Scattergood Postponed | Gas, combined cycle | 13.3 mi | 346 |
| Westminster Reliability Project, LLC Under construction | Storage | 13.9 mi | 110 |
| PRIME DATA CENTER VERNON Built | Large load | 14.5 mi | |
| Bandini - SLLAX710 Under construction | Solar | 14.8 mi | 1.3 |
Sources CAISO · EIA-860M · EPA ICIS-NPDES