Show on map
Combination Project #1, Expansion #1 (MP2) - North Miramar SLF — RNG project · Landfill gas to electricity · Fortistar Methane GroupEnerSmart Mesa Heights Sub Station — Under construction · Battery storage · CA · 3 MW · 2.3 mi awayL3 Harris San Diego — Under construction · Solar · CA · 1.6 MW · 2.8 mi awayRancho Penasquitos — Under construction · Hydro · CA · 4.3 MW · 6.3 mi awayAlvarado Hydro Facility — Postponed · Hydro · CA · 1.4 MW · 8.7 mi awayPomerado Energy Storage, LLC — Postponed · Battery storage · CA · 6 MW · 9.2 mi awayEnerSmart Murray BESS — Postponed · Battery storage · CA · 21 MW · 9.3 mi awayCA National City Terminal Ave — Under construction · Solar · CA · 1.1 MW · 14.2 mi awayEnerSmart El Cajon BESS — Postponed · Battery storage · CA · 3 MW · 14.2 mi away
  • Clean firm
  • Wind & solar
  • Storage
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Combination Project #1, Expansion #1 (MP2) - North Miramar SLF

RNG project · Landfill gas to electricity

Key facts

RNG project · Landfill gas to electricity Operating
Location
San Diego County, California
Operated by
Fortistar Methane GroupSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Project type
Reciprocating Engine
Technology
Landfill gas to electricity
Rated capacity
3.2 MW
LFG flow to project
1.73 MMscf/d
Start year
2012

Capacity not stated

All 11 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
Landfills2
Actual generation (MW)3.20
Landfill opened1973
Landfill closure year1983
Waste in place (tons)6,901,184
Waste in place, year1983
Landfill design capacity (tons)6,901,184
Landfill gas collected (MMscf/d)0.042
Landfill gas generated (MMscf/d)0.707
Direct emission reductions (MMTCO2e/yr)0.016
Avoided emissions (MMTCO2e/yr)0.002

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
EnerSmart Mesa Heights Sub Station Under construction Battery storage 2.3 mi 3
L3 Harris San Diego Under construction Solar 2.8 mi 1.6
Rancho Penasquitos Under construction Hydro 6.3 mi 4.3
Alvarado Hydro Facility Postponed Hydro 8.7 mi 1.4
Pomerado Energy Storage, LLC Postponed Battery storage 9.2 mi 6
EnerSmart Murray BESS Postponed Battery storage 9.3 mi 21
CA National City Terminal Ave Under construction Solar 14.2 mi 1.1
EnerSmart El Cajon BESS Postponed Battery storage 14.2 mi 3

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution