L3 Harris San Diego
Solar
Key facts
Solar Under construction (source status: (V) Under construction, more than 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- In-service date
- (stated)
- Location
- San Diego County, California
Details
Who’s behind it
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Solar source: “Solar Photovoltaic”
- EIA plant
- 69711 generator 6672
Timeline
- Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).
- Stated In-service date stated by EIA-860M.
- EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-10-01 → 2026-11-01.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| EnerSmart Mesa Heights Sub Station Under construction | Storage | 0.9 mi | 3 |
| Alvarado Hydro Facility Postponed | Hydro | 6.2 mi | 1.4 |
| EnerSmart Murray BESS Postponed | Storage | 6.9 mi | 21 |
| Rancho Penasquitos Under construction | Hydro | 8.0 mi | 4.3 |
| Pomerado Energy Storage, LLC Postponed | Storage | 9.8 mi | 6 |
| CA National City Terminal Ave Under construction | Solar | 11.7 mi | 1.1 |
| EnerSmart El Cajon BESS Postponed | Storage | 12.2 mi | 3 |
Sources EIA-860M